Greening method for garden slope
A technology for slopes and gardens, applied in the field of garden slope restoration, can solve the problems of inability to guarantee the growth condition of grass plants and high cost of checkered soil foundation, and achieve the effects of good growth conditions, low cost and wide sources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Step (1): On the basis of the existing slope, remove the large stones, level the slope, divide the soil layer into lumps and hammer, between the lumps of soil 1 and the lumps of soil 1 Reserve a groove, lay a layer of slag in the groove, and press it tightly. The groove 2 includes vertical grooves and horizontal grooves. The depth of the vertical grooves decreases with the height of the slope, and the depth of the horizontal grooves The depth is the same, the distance between the grooves 2 is determined according to the slope of the slope,
[0028] Step (2): prepare some bamboo tubes 3, the diameter of the bamboo tubes 3 is 5 centimeters, and the length is 3 meters, punch a hole on the membrane layer 31 inside a joint at one end of the bamboo tube 3, remove all the membrane layers 31 inside the remaining joints, Make the inside of the remaining joints form a through-hole, and perforate the periphery of each bamboo tube, and fill the bamboo tube with water-retaining mate...
Embodiment 2
[0033] Step (1): On the basis of the existing slope, remove the large stones, level the slope, divide the soil layer into lumps and hammer, between the lumps of soil 1 and the lumps of soil 1 Reserve groove 2, spread a layer of slag in groove 2, and press it tightly. The groove 2 is set obliquely downward, forming an angle between groove 2 and groove 2, and the four grooves form a rhombus. The depth of 2 decreases as the height of the slope decreases, and the angle between the grooves 2 is determined according to the slope of the slope.
[0034] Step (2): prepare some bamboo tubes 3 of suitable length, the diameter of bamboo tube 3 is 10 centimeters, and length is 5 meters, on the membrane layer 31 inside a joint of one end of bamboo tube 3, perforate, the membrane layer 31 inside remaining joint Remove all the remaining joints to form a through-hole, and punch holes around the small joints of each bamboo tube, and fill the bamboo tube with water-retaining materials. The water...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com