High-speed railway bridge large-diameter prefabricated tubular pile long spiral hole lead construction method
A technology of prefabricated pipe piles and high-speed railways, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc. It can solve the problems of pile head explosion and failure to drive to the design depth, and achieve the effect of low cost and safe operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0047] The principles and features of the present invention will be described below, and the examples given are only used to explain the present invention, not to limit the scope of the present invention.
[0048] The newly-built Beijing-Xiong Intercity Railway leads from Liying Station on the existing Beijing-Kowloon Line to Xiongan New District. Huangcun Elevated Station, Gu'an East Station, Bazhou North Station, Xiong'an Station, etc. are set along the line. The main construction tasks of the fifth bid section under the responsibility of the China Railway Shanghai Engineering Bureau are the first bridge, the first station, the first line and related relocation projects. The first bridge is the Guba Bridge with a length of 13.6 kilometers and is located in Yongqing County, Gu'an County and Bazhou City in Langfang City; the first station is Bazhou North Station, with a total length of 1.6 kilometers, located in Bazhou City; Route, located in Xiongan. This method has been applie...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
| The inside diameter of | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


