High-speed railway bridge large-diameter prefabricated tubular pile long spiral hole lead construction method

A technology of prefabricated pipe piles and high-speed railways, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc. It can solve the problems of pile head explosion and failure to drive to the design depth, and achieve the effect of low cost and safe operation

Inactive Publication Date: 2019-04-12
CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD +2
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In North China, the geology is dominated by silt, silty clay, clay, silt, and fine sand. Usually, pipe piles cannot pass through the sand layer in the soil smoothly only by the hammering method, and the pile head is easily driven into the ground. Explosion, unable to hit the designed depth

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-speed railway bridge large-diameter prefabricated tubular pile long spiral hole lead construction method
  • High-speed railway bridge large-diameter prefabricated tubular pile long spiral hole lead construction method
  • High-speed railway bridge large-diameter prefabricated tubular pile long spiral hole lead construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] The principles and features of the present invention will be described below, and the examples given are only used to explain the present invention, not to limit the scope of the present invention.

[0048] The newly-built Beijing-Xiong Intercity Railway leads from Liying Station on the existing Beijing-Kowloon Line to Xiongan New District. Huangcun Elevated Station, Gu'an East Station, Bazhou North Station, Xiong'an Station, etc. are set along the line. The main construction tasks of the fifth bid section under the responsibility of the China Railway Shanghai Engineering Bureau are the first bridge, the first station, the first line and related relocation projects. The first bridge is the Guba Bridge with a length of 13.6 kilometers and is located in Yongqing County, Gu'an County and Bazhou City in Langfang City; the first station is Bazhou North Station, with a total length of 1.6 kilometers, located in Bazhou City; Route, located in Xiongan. This method has been applie...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Diameteraaaaaaaaaa
The inside diameter ofaaaaaaaaaa
Login to View More

Abstract

The invention belongs to the field of high-speed railway bridges and in particular relates to a high-speed railway bridge large-diameter prefabricated tubular pile long spiral hole lead construction method which comprises the following steps: straightening a first section of a prefabricated tubular pile, and beating into the ground; welding a second section of the prefabricated tubular pile with the first section of the prefabricated tubular pile; inserting the screw rod of a long screw rod drilling machine into a drilling hole in the tubular pipe from the top of the second section of the prefabricated tubular pile, leading the hole till a depth required by design, straightening the prefabricated tubular pile, and beating into the ground; welding a third section of the prefabricated tubular pile with the second section of the prefabricated tubular pile, straightening the prefabricated tubular pile, and beating into the ground; repeating the steps in later prefabricated tubular pile construction till a last section of the prefabricated tubular pile is beaten into the ground till a design depth, thereby completing construction of all prefabricated tubular piles. By adopting the construction method, the long screw rod drilling machine is adopted to lead holes and expand soil, the resistance of a prestress reinforced concrete prefabricated tubular pile passing through a sand layeris reduced, the prestress reinforced concrete prefabricated tubular pile can penetrate through the sand layer smoothly, a hole is not broken at a design depth, and construction quality can be ensured.

Description

Technical field [0001] The invention relates to a method for constructing a long spiral lead hole of a large-diameter prefabricated pipe pile for a high-speed railway bridge, which belongs to the field of high-speed railway bridges. Background technique [0002] Conventional foundation reinforcement method-pipe pile reinforcement is mainly used for housing construction, with a diameter of less than 0.6m. The conventional pipe pile construction is to directly drive the pipe pile to the design position. In the high-speed railway construction technology, there is no domestic precedent for the construction of pre-stressed reinforced concrete precast pipe piles with a diameter of 1.0m. In North China, the geology is dominated by silt, silty clay, clay, silt, and fine sand. Under normal circumstances, only by hammering, pipe piles cannot pass through the sand layer in the soil smoothly, and the pile head is easily driven. Explosion, unable to hit the design depth. Summary of the inve...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 杨斌马西章龙亮侯宇飞胡鹏田亿蒋增虎扈德志
Owner CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD