Modular prefabricated segment assembled railway solid pier
A prefabricated assembly and modularization technology, applied to bridges, bridge parts, bridge materials, etc., can solve the problems of too large segments, difficult transportation and hoisting, etc., and achieve the effects of reducing engineering costs, improving construction efficiency, and reliable connection methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The specific implementation manner of the present invention will be described in detail below in combination with the technical scheme and accompanying drawings.
[0036] The method for making the above-mentioned modular prefabricated segmental assembled pier based on the block stacking concept includes the following steps:
[0037] 1) Complete the prefabrication work of section 1, module 7, module 8, module 9, module 10, and section 4 in the prefabrication factory. Grooves and bosses with shear keys respectively. After prefabrication work is completed, all prefabricated components are transported to the site.
[0038] 2) Clean the groove and boss of the shear key on the module and the upper surface of the module, and apply epoxy adhesive 14 on the segment contact surface and the mortise and tenon part of the module.
[0039] 3) Place the module as follows Figure 3-4 The assembly method is assembled into segment 2 and segment 3.
[0040] 4) if figure 1shown. Accor...