The invention discloses an
assembly integral type concrete frame structure of dry-wet mixed connection of nodes and a construction method. The
assembly integral type concrete frame structure comprises pre-fabricated concrete pillars, pre-fabricated
concrete beams, node local pre-stressed tendons, pre-fabricated concrete plates and rear-poured concrete combined interface
layers; in an installation construction stage of a
structural system, pre-fabricated components of the beams and the pillars adopt local pre-stress exerting and are connected in a dry mode, step-shaped rabbets at the ends of the pre-fabricated
concrete beams are stored on side brackets of the pre-fabricated concrete pillars, and the pre-stressed tendons are inserted into vertical cross arc-shaped porous channels reserved in the beam ends and the node pillar sections of the pre-fabricated concrete pillars and are stretched; after dry-type connection between the pre-fabricated
concrete beams and the pre-fabricated concrete pillars is completed, and the structural
bearing capacity is achieved; in a using stage, after the pre-fabricated concrete plates or steel bearing plates, the pre-fabricated beams and steel rebars on the upper portions of the pre-fabricated plates are installed, the concrete combined interface
layers are poured, and wet-type connection among the pre-fabricated concrete pillars, the pre-fabricated concrete beams and the pre-fabricated concrete plates is completed; and through dry-and-wet-type mixed connection of the nodes, the
assembly integral type concrete frame structure is formed.