A technology for polluted soil and polycyclic aromatic hydrocarbons, which is applied in the restoration of polluted soil and other directions, can solve problems such as unsatisfactory treatment effects, and achieve the effects of delaying the oxidation reaction rate, reducing the cost of remediation treatment, and improving the removal efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Use an excavator to take 100 tons of polycyclic aromatic hydrocarbon-contaminated soil, use a screening and crushing bucket to screen and remove construction waste larger than 50 mm, and crush the screened contaminated soil. After crushing, the particle size of the soil can be reduced to less than 50 mm. Add 20kg EDTA and 100kg ferrous sulfate to the pretreated soil after sieving and crushing, and stir and mix with a sieving and crushing bucket. Then add 400kg of sodium persulfate and an appropriate amount of water to the soil, and stir with a sieve breaker. The soil after adding the medicine and mixing is placed in the temporary storage area for maintenance for 7 days, and the soil that meets the repair standard is obtained.
Embodiment 2
[0047] Use an excavator to take 100 tons of polycyclic aromatic hydrocarbon-contaminated soil, use a sieving bucket to sieve and remove construction waste larger than 50mm, and crush the sieved contaminated soil. After crushing, the particle size of the soil can be reduced to less than 50mm. Add 40kg EDTA and 200kg ferrous sulfate to the pretreated soil after sieving and crushing, and stir and mix with a sieving and crushing bucket. Then add 800kg of sodium persulfate and an appropriate amount of water to the soil, and mix with a sieve breaker. The soil after adding the medicine and mixing is placed in the temporary storage area for maintenance for 7 days, and the soil that meets the repair standard is obtained.
Embodiment 3
[0049] Use an excavator to take 100 tons of polycyclic aromatic hydrocarbon-contaminated soil, use a sieving bucket to sieve and remove construction waste larger than 50mm, and crush the sieved contaminated soil. After crushing, the particle size of the soil can be reduced to less than 50mm. Add 60kg NTA and 300kg ferrous sulfate to the pretreated soil after sieving and crushing, and stir and mix with a sieving and crushing bucket. Then add 1.2 tons of sodium persulfate and an appropriate amount of water to the soil, and mix with a sieving and breaking bucket. The soil after adding the medicine and mixing is placed in the temporary storage area for maintenance for 7 days, and the soil that meets the repair standard is obtained.