A construction method of waterproof and consolidated structure for tunnels passing through debris flow deposits

A construction method and stacking body technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of lack of compactness, low overall bearing capacity, long construction time period, etc., and achieve waterproofing and stability enhancement. Stability and water resistance, the effect of fewer grouting cycles

Active Publication Date: 2020-10-16
CCCC SECOND HIGHWAY ENG CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Debris flow deposits are composed of round gravel, breccia and phyllite with different particle sizes, and partially mixed with sandy water-saturated loess. It has large porosity, is full of water, and has underground mobility. The overall bearing capacity is low. During the construction of the debris flow accumulation tunnel, because the excavation range of the tunnel is rich in surface water, the surrounding rock of the tunnel is loose and lacks sufficient compactness. During the excavation process, the surface water is prone to seepage, causing water seepage and landslides, etc. , seriously affecting the efficiency of tunnel excavation and the safety of construction personnel
The traditional small conduit grouting method, because of its small construction scale and small reinforcement range, the effect after grouting is uncertain and the reliability is relatively poor. The effect of this method is very limited, and it takes more time and cycles, the construction time period is long, and the efficiency is not high. This method cannot meet the construction requirements of tunnels passing through debris flow accumulation bodies.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method of waterproof and consolidated structure for tunnels passing through debris flow deposits
  • A construction method of waterproof and consolidated structure for tunnels passing through debris flow deposits
  • A construction method of waterproof and consolidated structure for tunnels passing through debris flow deposits

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:

[0025] The embodiment of the present invention is the Cangyuan Tunnel. The Ganjiagou that the Cangyuan Tunnel crosses in the DK378+380-DK378+643 section is a debris flow gully with a total length of 263m. The scale of the debris flow ditch is large, and the main geology is round gravel, breccia and phyllite. There is a small amount of surface water in Ganjiagou within the tunnel area, which is usually small and has a large torrent in the rainy season. According to conventional geophysical prospecting analysis, the diluvial fine breccia in Ganjiagou is rich in water. It is predicted that the maximum total water inflow of the tunnel passing through the Ganjiagou debris flow ditch is 3219m 3 / d, and affected by seasonal precipitation, the water inflow varies greatly.

[0026] The embodiment of the present invention provides a waterproof consolidation structur...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method of a waterproof solidification structure for penetrating through a debris flow accumulation body tunnel. The construction method of the waterproof solidification structure for penetrating through the debris flow accumulation body tunnel comprises the following steps that S1, construction is prepared; S2, surveying and setting out are carried out; S3, drilling machine positioning and drilling are carried out; S4, drilling is carried out; S5, a grouting pipe is buried and a pipe opening is blocked; S6, grouting is carried out; and S7, grouting is completed. Grouting holes are drilled for 2-5 turns, a hole arrangement mode is quincuncial pile type hole arrangement, and a spacing between every two adjacent holes is 950mm-1050mm; and deviation of a practical drilling position and a designed position of the holes is controlled within a range of 5cm, and the hole depth is 0.5m-0.6m longer than the length of the buried grouting pipe. Grouting liquidfor grouting is a mixture of cement, water, sodium silicate and a retarder, and a water cement ratio is (0.7-1) to 1; the concentration of the sodium silicate is 35-40 baume degrees, and a volume ratio of the sodium silicate to cement paste is 1 to 1; and the dosage of the retarder is 11-11.5Kg / m<3>. By using the construction method of the waterproof solidification structure for penetrating through the debris flow accumulation body tunnel, a good reinforcing and water stop role can be played on surrounding rock penetrating through the debris flow accumulation body tunnel, the construction time is short, the operation cycle index is less, and the production efficiency is high.

Description

technical field [0001] The invention relates to a construction method for a waterproof consolidation structure passing through a debris flow accumulation body tunnel, and belongs to the technical field of civil engineering. Background technique [0002] Debris flow deposits are composed of round gravel, breccia and phyllite with different particle sizes, and partially mixed with sandy water-saturated loess. It has large porosity, is full of water, and has underground mobility. The overall bearing capacity is low. During the construction of the debris flow accumulation tunnel, because the excavation range of the tunnel is rich in surface water, the surrounding rock of the tunnel is loose and lacks sufficient compactness. During the excavation process, the surface water is prone to seepage, causing water seepage and landslides, etc. , Seriously affect the efficiency of tunnel excavation and the safety of construction personnel. The traditional small conduit grouting method, b...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10E21D11/38
CPCE21D11/10E21D11/38
Inventor 崔小鹏齐甦王立英李庆远李智博韩高耀王成武
Owner CCCC SECOND HIGHWAY ENG CO LTD