A construction method of waterproof and consolidated structure for tunnels passing through debris flow deposits
A construction method and stacking body technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of lack of compactness, low overall bearing capacity, long construction time period, etc., and achieve waterproofing and stability enhancement. Stability and water resistance, the effect of fewer grouting cycles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
[0025] The embodiment of the present invention is the Cangyuan Tunnel. The Ganjiagou that the Cangyuan Tunnel crosses in the DK378+380-DK378+643 section is a debris flow gully with a total length of 263m. The scale of the debris flow ditch is large, and the main geology is round gravel, breccia and phyllite. There is a small amount of surface water in Ganjiagou within the tunnel area, which is usually small and has a large torrent in the rainy season. According to conventional geophysical prospecting analysis, the diluvial fine breccia in Ganjiagou is rich in water. It is predicted that the maximum total water inflow of the tunnel passing through the Ganjiagou debris flow ditch is 3219m 3 / d, and affected by seasonal precipitation, the water inflow varies greatly.
[0026] The embodiment of the present invention provides a waterproof consolidation structur...