Fall ground level smelting furnace and continuous casting and rolling production line installation method
A technology of continuous casting and rolling, installation method, which is applied in the direction of metal rolling, etc., can solve the problems of limited operating platform space, inconvenient operation of copper oxide, large engineering quantity, etc., and achieve spacious operating space, good heat dissipation effect, and convenient operation Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] The present invention is an installation method for a smelting furnace with a ground level drop and a continuous casting and rolling production line. On the round platform, a raw material packaging workshop is set at the highest point of the ground level. The feeding pipeline above the melting furnace is connected to the raw material packaging workshop, and the discharging pipeline of the melting furnace is connected to the steel structure operation platform; The four corners of the end face are provided with supporting columns, and the middle part of the steel structure operation platform is provided with a pouring main engine. The discharge pipe of the melting furnace and the pouring main engine are located on the same horizontal plane, and the molten metal produced by the melting furnace is poured and shunted through the pouring main engine; S3: pouring main engine There is a backwater pool on the side, the backwater pool is 50cm below the ground level, the backwater ...
Embodiment 2
[0022]This embodiment is optimized on the basis of Embodiment 1. The cooling tower in step S3 is arranged outside the steel structure operation platform. The air inlet and air outlet of the cooling tower are located on the same horizontal plane. The angle between them is 90 degrees, and the air inlet is set on the side away from the steel structure operating platform. The cooling tower needs to be installed outside the steel structure operating platform to avoid the high temperature inside the steel structure operating platform from affecting the cooling effect, and because the air inlet is facing away from the steel structure operating platform, the high temperature generated by the steel structure operating platform will heat the air, and the cold air will flow from all sides It flows in towards the steel structure operation platform, and the air inlet is far away from the steel structure operation platform, just facing the cold air, which can collect the cold air at the firs...
Embodiment 3
[0024] This embodiment is optimized on the basis of Embodiment 1. The height of the cement round platform in the step S1 is 200 cm, and a layer of elastic rubber is wrapped on the outside of the feed pipe connecting the raw material packaging workshop and the melting furnace. The height of the cement round table is set to 200cm to avoid the impact of the high temperature generated by the melting furnace on the ground. Because the long-term use of the melting furnace has a great impact on the ground, it is necessary to reinforce the ground to avoid excessive impact of long-term high temperature on the ground. The design of the round table can be observed through the round table at the first time after the ground is deformed. After the deformation of the round table, it can be repaired in time to avoid serious consequences. In order to protect the feed pipe and avoid the impact of the raw material packing block on the feed pipe, a layer of elastic rubber is wrapped to avoid the i...