The present application relates to a kind of
continuous casting machine quick replacement crystallizer's method, belong to
steelmaking continuous casting equipment overhaul method technical field.The technical scheme of the present application is: using the track arrangement high leg
single beam crane and low leg
single beam crane of
tundish car dismounts and installs crystallizer, in situ handheld electric
handle operation;Crystallizer
inlet valve and crystallizer
backwater valve adopt pneumatic
cut-off valve;Crystallizer replacement is divided into preparation, replacement and finishing three stages.The beneficial effects of the present application are: under the condition of guaranteeing safety, to improve the efficiency of replacing crystallizer, corresponding increase the time of
continuous casting machine production.