A construction method and technology for water pipelines, applied in infrastructure engineering, construction, etc., can solve the problems of slow construction speed, complex process, river water pollution, etc., and achieve the effect of fast construction speed, simplified construction process, and reduced pollution.

Active Publication Date: 2021-07-02
CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The present invention solves the problems of traditional construction methods such as complex process, slow construction speed and serious pollution to river water, and provides a water intake method that is simple in operation, speeds up construction progress, shortens construction period, has high production efficiency, ensures construction quality, and reduces environmental pollution caused by construction. Pipe fixing construction method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for fixing a water intake pipeline
  • A construction method for fixing a water intake pipeline
  • A construction method for fixing a water intake pipeline

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In conjunction with the description of the accompanying drawings, the specific embodiments of the present invention are further described:

[0032] refer to Figure 1-Figure 6 , the present invention provides a kind of water intake pipe fixing construction method, construction steps are as follows:

[0033] S1: The construction platform on the ship is built; the ship is anchored and fixed, and a temporary construction platform is set up on the ship, which overcomes the problem of providing a construction surface in a complex environment. Secondly, the construction speed of the river surface construction platform is fast, and has little impact on the river water and surrounding environment, which is conducive to the success of subsequent projects. carry out guarantees;

[0034] S2: Piling steel pipe piles; the outer casing is buried, drilled, and the inner casing is installed. The length of the casing is the full length of the pile. The inner casing is equipped with a s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of water intake pipeline support piers, and in particular relates to a construction method for fixing a water intake pipeline, which solves the problems of complicated techniques, slow construction speed and serious river water pollution in the traditional construction method. The construction steps of the present invention are as follows: S1: the construction platform on board is built; S2: steel pipe piles are driven; the outer casing is buried, drilled, the inner casing is installed, and the steel cage in the inner casing is poured with concrete; S3: the fixing device is installed; The steel pipe pile is fitted with a hoop bracket, and the boat-shaped steel pier box is set outside the steel pipe pile and lowered to the top of the hoop bracket, the position of the boat-shaped steel pier box is finely adjusted, welded, fixed, and sealed; S4: Water intake pipeline installation; water intake pipeline Lower it into the U-shaped groove of the boat-shaped steel pier box, plug and seal it; S5: pour concrete into the boat-shaped steel pier box; S6: pour the pipeline foundation outside the boat-shaped steel pier box. The invention has the advantages of simple operation, accelerated construction progress, shortened construction period, high production efficiency, guaranteed construction quality, and reduced construction pollution to water sources.

Description

technical field [0001] The invention belongs to the technical field of water intake pipeline support piers, and in particular relates to a construction method for fixing a water intake pipeline. Background technique [0002] It is imperative to relocate the intake of urban waterworks. Large-scale water intake pipes are all set in the river, the water flow is unpredictable, and the underwater terrain is complicated. The traditional construction method is to create a construction area in the river cofferdam, drain the water in the construction area of ​​the cofferdam, and carry out the construction in the construction area. The reinforcement construction of the water intake pipe, the traditional construction method is complicated, the construction speed is slow, and the river water is seriously polluted. Contents of the invention [0003] The present invention solves the problems of traditional construction methods such as complex process, slow construction speed and seriou...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D27/46
CPCE02D27/46
Inventor 李舒云朱志根赵永锋冉国建金志强薛磊王晨光刘增利宋亮辉吕国庆田占鹏孟凯
Owner CHINA RAILWAY NO 3 GRP CO LTD