Incinerator for carrying out secondary combustion on waste gas
A secondary combustion and incinerator technology, applied in the field of incinerators, can solve the problems of insufficient combustion of waste and inability to clean up sediments in time, so as to avoid the escape of water bodies, avoid the outflow of water bodies, and increase the contact surface. big effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] like Figure 1-5 As shown, an incinerator for secondary combustion of exhaust gas includes a base 1, and sockets 2 are opened on both sides of the base 1. When moving an object, a lever is inserted into the socket 2, which is convenient for the staff to move. A furnace body 3 is fixed on the upper surface of the base 1, a door panel 4 is installed on one side of the furnace body 3, an observation window 5 is embedded in the front of the furnace body 3, and a through hole 11 is opened on the front of the furnace body 3. A round table 15 is installed, and the round table 15 is designed to be hollow, and the upper and lower surfaces are connected. The first incineration chamber 13 is located below the round table 15, and a sieve plate 14 is fixed below the first incineration chamber 13. A placement plate is designed above the sieve plate 14. 25, several cavities 26 are provided on the placement plate 25, two groups of telescopic rods 28 are symmetrically placed inside the ...
Embodiment 2
[0031] like Figure 1-5 As shown, an incinerator for secondary combustion of exhaust gas, the top of the round table 15 is a settling chamber 16, which is used to settle the dust in the flue gas, the upper surface of the round table 15 is fixed with a first air guide 17, the round table 15 Water is injected between the side of 15 and the furnace body 3, and a scraper 19 is arranged on one side of the round platform 15, and the other end of the scraper 19 is fixed on the second connecting plate 18, and the second connecting plate 18 is arranged on the side of the furnace body 3. On the outside, a first connecting plate 6 is arranged on the outside of the furnace body 3 , and a supporting plate 12 is arranged under the first connecting plate 6 and the second connecting plate 18 , and the supporting plate 12 is installed on the side of the furnace body 3 .
[0032] The top of the settling chamber 16 is set as a second incineration chamber 7 , and a gas analyzer 8 is installed on ...