Multi-jig-frame assembled steel box girder construction auxiliary device and construction method thereof
A technology of auxiliary device and construction method, applied in the direction of erecting/assembling bridges, bridges, bridge materials, etc., can solve the problem of inability to assemble the tire frame construction and other problems, and achieve the effect of shortening the production cycle, improving the construction progress and accuracy, and reducing the construction cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.
[0025] like Figure 1 to Figure 2 As shown, a multi-carrier frame assembled steel box girder construction auxiliary device is characterized in that it includes: a segmented steel box girder, a modeling device and a non-contact 3D scanning device, wherein the segmented steel box girder includes: a box girder transverse Partition plate 1, box girder web 2, box girder top plate 3, stiffener 4, bottom plate 5, stiffener 4 is arranged on the lower surface of box girder top plate 3 and the upper surface of bottom plate 5, box girder web 2 is vertically arranged on Between the box girder top plate 3 and the bottom plate 5, the box girder diaphragm 1 is perpendicular to the box girder web 2 and placed between the box girder top plate 3 and the bottom plat...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

