Space foundation measurement and control data transmission resource overall scheduling priority system design method
A technology of scheduling priority and design method, applied in the field of aerospace measurement and control, can solve the problems of many information interaction links, no unified task priority system, and restricting the maximum use efficiency of resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0090] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0091] The design method of the priority system of the overall planning and scheduling of the space-to-ground measurement and control digital transmission resources of the present invention, such as Figure 1-3 As shown, the specific steps are as follows:
[0092] Step 1. Establish an evaluation model
[0093] The evaluation model of task priority adopts the idea of layered modeling. For a large number of sub-tasks of different types of support tasks, according to the three levels of task requirements, space control and equipment use, the task demand priority, space control priority and equipment use priority are respectively established. Level model, the priority of each level is determined by the weighted calculation of different weight indicators;
[0094] In step 1, the calculation formula of the evaluation model of the task priority ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com