A technology of enclosure structure and construction method, which is applied in the direction of basic structure engineering, excavation, construction, etc., can solve the problems of slow construction speed, waste of resources, and time-consuming and other problems of pile piles, and achieve the purpose of overcoming insufficient occlusal degree, improving construction efficiency, The effect of speeding up construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0127] This embodiment provides a more advantageous new type of deep foundation pit enclosure structure that can be applied to a large depth and has a large groundwater pressure. According to its form and function, it is named "embossed pile".
[0128] The embedded pile is a foundation pit enclosure structure formed by an arrangement of cast-in-situ piles. Cast-in-situ piles are piles formed by cast-in-place concrete, which are mainly poured with underwater concrete pouring. Among the mosaic piles, one is called "main pile" and the other is called "auxiliary pile". The "main pile" and "auxiliary pile" are arranged alternately; Pile embedded.
[0129] The space reserved in the auxiliary pile for fitting the main pile is called the "fitting cavity"; the intersecting part of the circumference of the main pile and the auxiliary pile is called the "common land"; Cavity", the difference between the two is the space specially set aside to accommodate the deviation that may occur du...
Embodiment 2
[0134] This embodiment provides a method for constructing an enclosure structure for a deep foundation pit, using a rotary drilling rig or a rotary drilling rig to form a hole. The auxiliary piles are constructed first, followed by the main piles. After the construction of auxiliary piles is completed for a section, or all of them are completed, the construction of main piles begins. When the main pile is drilled, the pile position can be properly adjusted without touching the concrete of the auxiliary pile because of the "reserved width". At the same time, if necessary, the drill bit can be properly offset to sweep the hole up and down to remove the embeddedness of the auxiliary pile. The attachment in the cavity ensures that the concrete of the main pile can be close to the concrete of the auxiliary pile.
[0135] The auxiliary piles are poured with underwater concrete, and the concrete strength grade should be the same or close to that of the main piles.
[0136] Auxiliar...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com