Subway tunnel ballast bed segment post-wall grouting method
A technology of grouting behind the wall and tunnel tunnel, applied in the direction of tunnel, tunnel lining, earthwork drilling and mining, etc., can solve the problems of high risk, water leakage, deformation of tunnel structure, etc., and achieve good corrosion resistance, tight contact and safety. good effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.
[0041] A post-grouting method for a subway tunnel track bed segment wall, comprising a grouting step and a sealing step, the grouting step being specifically:
[0042] Such as figure 1 with figure 2 , open a blind hole 16 on the ballast bed 1 before the rail 4 and the crossties 5, and install a reinforcement glue in the blind hole 16, insert the grouting pipe 3 into the blind hole 16, and open a through hole through the segment at the bottom of the blind hole 16 17. The grouting pipe 3 is connected to the ball valve, and the grouting pump is used to inject grout into the ball valve...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com