Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Subway tunnel ballast bed segment post-wall grouting method

A technology of grouting behind the wall and tunnel tunnel, applied in the direction of tunnel, tunnel lining, earthwork drilling and mining, etc., can solve the problems of high risk, water leakage, deformation of tunnel structure, etc., and achieve good corrosion resistance, tight contact and safety. good effect

Active Publication Date: 2020-11-03
SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT
View PDF11 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This kind of uneven settlement is likely to cause water leakage in the longitudinal and annular joints of tunnel segments, and the increase of water leakage will intensify the development of uneven settlement in tunnels, especially under the subway track bed in shield tunnels The settlement disease behind the segment wall is more serious. If it is not dealt with in time, it will cause damage to the tunnel segment and threaten the operation safety of the subway
[0003] The existing method is to open a grouting hole on the ballast bed, grout behind the segment wall through the grouting hole, and then use the grout to block the grouting hole, but this method is risky, and mud gushing, sand gushing, and tunnel settlement are prone to occur later and deformation of the tunnel structure

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Subway tunnel ballast bed segment post-wall grouting method
  • Subway tunnel ballast bed segment post-wall grouting method
  • Subway tunnel ballast bed segment post-wall grouting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

[0041] A post-grouting method for a subway tunnel track bed segment wall, comprising a grouting step and a sealing step, the grouting step being specifically:

[0042] Such as figure 1 with figure 2 , open a blind hole 16 on the ballast bed 1 before the rail 4 and the crossties 5, and install a reinforcement glue in the blind hole 16, insert the grouting pipe 3 into the blind hole 16, and open a through hole through the segment at the bottom of the blind hole 16 17. The grouting pipe 3 is connected to the ball valve, and the grouting pump is used to inject grout into the ball valve...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a subway tunnel ballast bed segment post-wall grouting method. The subway tunnel ballast bed segment post-wall grouting method comprises a grouting step and a sealing step. The grouting step specifically comprises the steps that a grouting hole is formed in a ballast bed, a grouting pipe is inserted into the grouting hole, and grouting is performed in the grouting pipe. The sealing step specifically comprises the steps of cutting a ballast bed around a grouting hole to a segment below the ballast bed, cutting off one part located on the outer side of the segment, of the grouting pipe, filling one part located in the segment, of the grouting pipe with double-fast cement or inserting a sealing plug, forming an annular third groove in the periphery of the grouting hole in the segment, placing an annular elastic sealing ring in the third groove; arranging a sealing plate on the elastic sealing ring, fixing the sealing plate to the segment through chemical bolts, and filling and leveling up the cut part on the ballast bed with a filler. Compared with the prior art, the subway tunnel ballast bed segment post-wall grouting method has the advantages of being betterin sealing performance and the like.

Description

technical field [0001] The invention relates to a subway tunnel maintenance technology, in particular to a post-grouting method for a subway tunnel track bed segment wall. Background technique [0002] The subway is becoming more and more popular in various cities. Some cities are located on soft soil foundations. Soft soil foundations are rheologically weak strata with high water content, high void ratio, high sensitivity, and low strength. Due to the influence of factors such as the soil properties of the strata around the tunnel, ground settlement, surrounding building construction activities, and vibration loads during train operation, it is easy to cause uneven and differential settlement in the overall settlement of the operating tunnel. This kind of uneven settlement is likely to cause water leakage in the longitudinal and annular joints of tunnel segments, and the increase of water leakage will intensify the development of uneven settlement in tunnels, especially und...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10
CPCE21D11/105
Inventor 丁鑫孙健华张宇君孙捷王晓霜叶盛谭周黄金范
Owner SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products