Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

BIM technology-based external hanging plate construction method of integrally assembled building

A construction method and a technology for external cladding, which are applied in the processing of building materials, construction, building structure, etc., can solve the problem that the deduction relationship of different building components cannot be fully and correctly reflected, the error of the three-dimensional model is large, and the calculation of the construction engineering quantity is wrong, etc. problem, to achieve the effect of high data production efficiency, high accuracy, and less model data volume

Active Publication Date: 2020-11-17
HUNAN INST OF TECH
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] To sum up, the problems existing in the existing technology are: the error of the 3D model built by the existing construction method of the external cladding of the overall prefabricated building based on BIM technology is relatively large; deduction relationship, especially the deduction relationship of complex structures, which will cause errors in the calculation of construction quantities

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM technology-based external hanging plate construction method of integrally assembled building
  • BIM technology-based external hanging plate construction method of integrally assembled building
  • BIM technology-based external hanging plate construction method of integrally assembled building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0074] The construction method of the external hanging board of the overall prefabricated building based on BIM technology provided by the embodiment of the present invention is as follows: figure 1 As shown, as a preferred embodiment, such as image 3 As shown, the building model construction method provided by the embodiment of the present invention is as follows:

[0075] S201. Obtain the input information of the required BIM building components; match the corresponding parameter information in the preset database according to the input information; assign the parameter information to the preset model in the BIM software to obtain the BIM building components;

[0076] S202. Obtain the two-dimensional position data of the two-dimensional element corresponding to the building element, and the shape data of the building element; generate the target three-dimensional model corresponding to the building element according to the two-dimensional position data and the shape data ...

Embodiment 2

[0085] The construction method of the external hanging board of the overall prefabricated building based on BIM technology provided by the embodiment of the present invention is as follows: figure 1 As shown, as a preferred embodiment, the model rendering module provided by the embodiment of the present invention uses a rendering program to obtain the generated architectural model;

[0086] Obtain the view angle matrix of the current observer and filter it to obtain the external panels of the architectural model in the field of view; use the quick sorting algorithm to sort the external panels of the architectural model in the field of view from near to far according to the distance of the viewpoint; the rendering of the model external panels obtained by sorting is based on Viewpoint distance decides to choose its model rendering level; judge whether the current rendering level of the model plug-in board has changed, if there is no change, continue rendering, if there is a chang...

Embodiment 3

[0088] The construction method of the external hanging board of the overall prefabricated building based on BIM technology provided by the embodiment of the present invention is as follows: figure 1 As shown, as a preferred embodiment, such as Figure 5 As shown, the engineering quantity calculation method provided by the embodiment of the present invention is as follows:

[0089] S401, by obtaining the original BIM file, the original BIM file includes multiple BIM entity objects constituting the building model; analyzing the original BIM file, extracting the geometric topology information and attribute information of each building element in the original BIM file; receiving and checking the design Drawings: Receive design drawings from the design unit, the design drawings include design instructions, architectural construction drawings, structural construction drawings, professional deepening drawings; check and adjust the drawings, and the adjustment contents include the pla...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of buildings, and discloses a BIM technology-based external hanging plate construction method of an integrally assembled building, which comprises the steps of collecting construction video data of an external hanging plate of a building, construction weather data of the external hanging plate of the building and construction material data of the external hanging plate of the building; constructing a building model; rendering an external hanging plate of the building model; selecting the optimal appearance of the external hanging plate of accordingto rendering effect; using a positioning mechanism for positioning the external hanging plate for building assembly assembling the external hanging plate of the building by utilizing an assembling mechanism; and calculating the construction amount of the external hanging plate of the building by utilizing a calculation program. According to the invention, through a building model construction module, the method has relatively high data production efficiency and relatively small model data volume, and a generated three-dimensional model is relatively high in accuracy; and meanwhile, various complex special-shaped component parameters can be calculated through an engineering quantity calculation module, and engineering quantity precision is enough to meet the actual working requirements.

Description

technical field [0001] The invention belongs to the technical field of construction, and in particular relates to a construction method for an external hanging panel of an integrally assembled building based on BIM technology. Background technique [0002] The external wall hanging board is a construction method, which is to hang the board on the outside of the wall by dry hanging and other construction methods to achieve decoration or heat preservation effects. From the product point of view, the external wall hanging board is a kind of building material, which is a building board used for the external wall. External wall hanging panels must have basic properties such as corrosion resistance, high temperature resistance, aging resistance, no radiation, fire prevention, insect resistance, and no deformation. At the same time, they must also have beautiful appearance, simple construction, environmental protection and energy saving. Common exterior wall hanging boards include...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13E04G21/14G06T17/00
CPCG06F30/13E04G21/14G06T17/00
Inventor 侯蕊樊陵姣陈诚李培锁
Owner HUNAN INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products