Arc-shaped roof prestressed reinforcement arrangement system and construction method thereof

A technology of prestressed steel bars and non-prestressed steel bars, which is applied to the prestressed steel bar layout system and its construction field on curved roofs, can solve problems such as not being able to meet construction needs, and achieve the reduction of component section weakening, obvious technical advantages, and convenient construction Improved effect

Active Publication Date: 2020-12-04
HUAJIANG CONSTR OF CHINA CONSTR FIRST BUILDING GROUP CORP +1
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a system for laying prestressed steel bars on curved roofs and its construction method, to solve the technical problem that the existing technology cannot meet the construction needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Arc-shaped roof prestressed reinforcement arrangement system and construction method thereof
  • Arc-shaped roof prestressed reinforcement arrangement system and construction method thereof
  • Arc-shaped roof prestressed reinforcement arrangement system and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to make the technical means, innovative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below.

[0032] The examples described here are specific specific implementations of the present invention, and are used to illustrate the concept of the present invention. They are all explanatory and exemplary, and should not be construed as limiting the implementation of the present invention and the scope of the present invention. In addition to the embodiments described here, those skilled in the art can also adopt other obvious technical solutions based on the claims of the application and the contents disclosed in the description, and these technical solutions include adopting any obvious changes made to the embodiments described here. Replacement and modified technical solutions.

[0033] A curved roof prestressed steel bar layout system, such as figure 1 and 2 As shown, two layers o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an arc-shaped roof prestressed reinforcement arrangement system and a construction method thereof. The arc-shaped roof prestressed reinforcement arrangement system comprises anupper arc-shaped prestressed reinforcement layer and a lower arc-shaped prestressed reinforcement layer, wherein the upper arc-shaped prestressed reinforcement layer is located below the upper non-prestressed reinforcement layer; the lower arc-shaped prestressed reinforcement layer is located above the lower non-prestressed reinforcement layer; each arc-shaped prestressed reinforcement layer comprises prestressed reinforcements which are uniformly arranged at intervals; the prestressed reinforcements comprise slow-bonding prestressed reinforcements; each prestressed reinforcement comprises a tensioning end, a fixing end and a steel strand connected to the tensioning end; each tensioning end comprises a spiral reinforcement I, a small bearing plate, a clamping piece anchor and a cavity diewhich are sequentially arranged; and each fixing end comprises a spiral reinforcement II, a single-hole bearing plate and an extrusion anchor which are sequentially arranged. According to the arc-shaped roof prestressed reinforcement arrangement system, the slow-bonding prestressed reinforcements are independently arranged in an arc-shaped roof and are effectively bonded with the full-length rangeof concrete, so that when holes need to be formed due to function change in the use stage, the prestressed steel strands can be flexibly cut off, and the arc-shaped roof prestressed reinforcement arrangement system has obvious technical advantages compared with non-bonded and bonded prestressed reinforcements.

Description

technical field [0001] The invention relates to the field of building construction, in particular to a system for laying prestressed steel bars on a curved roof and a construction method thereof. Background technique [0002] Prestressed steel bars can effectively reduce the temperature cracks caused by large spans because they can bring better tensile or compressive resistance when used, so they are popularized in the construction industry. However, most of the existing prestressed steel bars are unbonded prestressed steel strands, which are clad on the basis of bonded steel strands, and do not directly contact with concrete soil, which is convenient for tensioning and gripping with concrete. Insufficient binding force, it is easy to loosen during use, which affects the performance. Bonded prestressed steel strands mean that the steel strands are in direct contact with the concrete. There is no outsourcing plastic tube, and the binding force with the concrete is strong, but...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B7/00E04C5/08E04C5/12E04G21/12
CPCE04B7/00E04C5/08E04C5/12E04G21/121
Inventor 杨斌辛海京李健男董清崇王春红唐健左良赵彦林李亨通崔理佳李拓
Owner HUAJIANG CONSTR OF CHINA CONSTR FIRST BUILDING GROUP CORP