Building equipment operation early warning and linkage control device and method
A construction equipment and linkage control technology, applied in program control, computer control, general control system, etc., to achieve the effect of optimizing data processing logic, improving operation management efficiency, and improving perception processing speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0069] refer to figure 1 , a device for early warning and linkage control of construction equipment based on BIM+IOT, including a base layer, a data layer, a storage layer, and an application layer. The base layer, data layer, storage layer, and application layer use mobile Internet communication , using http, TCP / IP and other protocols for information exchange, among which:
[0070] The base layer includes BIM model and building intelligent system, wherein BIM model includes BIM architectural model, BIM structure model, BIM electromechanical model and other models, and building intelligent system includes BA system, intelligent lighting system, video surveillance system and other systems ;
[0071] The data layer includes static data and dynamic data, wherein the static data is coded, geometric, non-geometric, and technical parameter information extracted from the BIM model, and the dynamic data includes the IP address information of the IOT device, the code information of t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com