Water drainage gas recovery system and method based on underground jet drainage and wellhead compression
A technology for drainage and gas production and compressors, which is applied in wellbore/well valve devices, wellbore/well components, and production fluids, etc., can solve the problems of high cost, complex process, large investment, etc., and saves investment and management. The effect of maintenance costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Drainage and gas recovery systems based on downhole jet drainage and wellhead compression, such as figure 1 As shown, it includes one end connected to the wellhead gas production system, the other end connected to the continuous gas lift system in the wellbore casing, and the jet diverter 16 arranged at the pipe hole in the wellbore tubing;
[0038] The wellhead gas production system includes the main control gate valve 1 and the test gate valve 2 connected to the wellhead gas production tree through flanges. The lower part and the upper part of the main control gate valve 1 are respectively connected to the first needle valve through the first casing gate valve 3 and the production gate valve 4. 5. The first needle valve 5 is sequentially connected to the external gas gathering station through the electromagnetic shut-off valve 6 and the first flow meter 7; the main control gate valve 1, the test gate valve 2, the first casing gate valve 3, and the production gate valve...
Embodiment 2
[0051] The gas recovery method of the drainage gas recovery system based on downhole jet drainage and wellhead compression, including two stages of well opening and continuous gas recovery;
[0052] The steps in the well opening phase are as follows:
[0053] A1. The controller controls the main control gate valve 1, the production gate valve 4, the electromagnetic shut-off valve 6, the first flow meter 7, the second bushing gate valve 14 normally open, the second end and the third end of the first three-way valve 8, the second The first end and the second end of the two-way valve 10 are opened, and the compressor 13 is controlled to start; the low-pressure gas in the external pipeline is introduced into the compressor 13;
[0054] A2. The gas enters the wellbore casing after being compressed by the compressor 13, and enters the jet diverter 16 to pressurize along the tubing hole and the air intake hole 164, lifts the downhole gas and liquid to the wellhead gas production syst...
Embodiment 3
[0061] Such as figure 1 As shown, the drainage gas recovery system based on downhole jet drainage and wellhead compression also includes a combustion tank 18 connected to the gas-liquid separator 9; the combustion tank 18 is used to introduce natural gas in the system for combustion when the system stops gas lift.
[0062] The beneficial effect of this embodiment is: the setting of the combustion tank ensures the safety of the continuous gas lift drainage gas recovery system, and facilitates the combustion of natural gas in the system when the gas lift is stopped, preventing it from leaking into the environment and causing environmental pollution .
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



