H-shaped steel beam bolt joint construction method
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- 中冶(上海)钢结构科技有限公司
- Publication Date
- 2021-02-19
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a full-bolt joint of an H-shaped steel beam in the construction industry, in particular to a construction method for a bolted joint of an H-shaped steel beam. Background technique
[0002] At present, the H-shaped steel girder rigid joints of steel structures mainly include bolted joints, fully welded joints, and full bolted joints. During the construction of common full bolted joints or steel beam connecting plates of bolted welded joints, temporary steel beams are firstly constructed. After installation, it is necessary to use a hanging cage or an operating platform to loosen the connecting plates. After installation, replace the high-strength bolts, and then carry out the initial and final screwing construction of the high-strength bolts. The construction process is cumbersome, especially for the web connecting plates and connecting plates. The weight is heavy, the installation is difficult, the installation efficiency is lo...