Durable asphalt based on low-grade asphalt and preparation method of durable asphalt
A low-grade, durable technology, applied to building components, building insulation materials, buildings, etc., can solve the problems of inability, poor thermal storage stability, and form stable structures to achieve good durability, excellent storage stability and Anti-aging performance, effect of reducing deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] In parts by mass, heat and melt 89.7 parts of AH-30 asphalt, add 3 parts of anti-aging agent, stir and add 5 parts of 40-mesh waste rubber powder material, stir and mix at a high speed of 195°C for 2 hours, and the stirring speed is 3000rpm, Then cool down to 185°C, slowly add 2 parts of SBS at a shear rate of 3500rpm, cut for 40 minutes, keep the temperature at 185°C, cut for 40 minutes, add 0.3 parts of stabilizer, and then stir and develop at 185°C for 3 hours , that is, the main performance indicators of the obtained asphalt are shown in Table 1.
Embodiment 2
[0023] In parts by mass, heat 88.35 parts of AH-30 asphalt to 200°C, add 2 parts of anti-aging agent, then add 8 parts of 80-mesh waste rubber powder material, stir for 3 hours at a stirring speed of 3500rpm, and then cool down to 185°C , at a shear rate of 3000rpm, slowly add 1.5 parts of SBS to shear for 30 minutes, keep the temperature at 185°C, add 0.15 parts of stabilizer, shear for 30 minutes, and then stir and develop at 185°C for 3 hours. The main performance indicators of asphalt are shown in Table 1.
Embodiment 3
[0025] In parts by mass, heat 88.2 parts of AH-30 asphalt to 200°C, add 10 parts of 60-mesh waste rubber powder material, stir for 3 hours at a stirring speed of 3500rpm, then cool down to 185°C, and under the condition of a shear rate of 3000rpm , slowly add 1.5 parts of SBS to cut for 30 minutes, keep the temperature at 185°C, add 0.3 parts of NH4L stabilizer, cut for 30 minutes, and then stir and develop at 185°C for 3 hours. The main performance indicators of the obtained asphalt are shown in Table 1.