An optimization method for temporary plugging and diversion between clustered perforation fractures in a horizontal well section
A technology of horizontal well section and optimization method, which is applied in design optimization/simulation, earthwork drilling and production, wellbore/well components, etc. It can solve problems such as weak applicability, and achieve the effect of strong versatility and reliable method principle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0088] refer to Figure 4 , considering the fracture propagation coupling model of inter-fracture temporary plugging in the segment is the coupled fracture propagation steering judgment model and the force analysis and setting standard model of the temporary plugging ball, coupling the fracture propagation steering judgment model and the temporary plugging ball force analysis and The steps to set the standard model are:
[0089] Establish a fracture propagation and steering judgment model, undertake the output results of the crack propagation simulation control equation group, and at any time, based on any total number of fracture discrete units, the stress field solution calculated by the crack propagation simulation control equation , substituted into the fracture propagation and turning judgment model, the conclusion of whether it is necessary to continue to expand and the deflection angle of the crack tip can be calculated. Until it is judged that the fracture growth proc...
Embodiment 2
[0098] The embodiment of the present application provides a method for optimizing the timing of temporary plugging and throwing balls between clustered perforation fractures in a horizontal well section and the number of balls thrown. This method can be used in the pre-pressure design link. By establishing a mathematical model, it will be simulated and run by a computer for many times. accomplish.
[0099] see figure 1 , which shows the main processing flow of the method for optimizing the timing of pitching and the number of pitches for temporary blocking, including the following steps:
[0100] Step 1. Collect 4 types of field data for the relevant target wells: the first type of data is the logging data and interpretation data of the designed well section of the target well, especially including the profile curve data related to rock mechanical properties and the three-dimensional in-situ stress profile curve data ; The second type of data is the guidance information for f...
PUM