A blast furnace slag and reducing agent technology, applied in the direction of improving process efficiency, can solve the problems of increased operation difficulty, shortened reduction period, and large changes, so as to reduce the degree of foaming, strengthen the reaction kinetics, and reduce the viscosity of the system. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] The TiO of molten titanium-containing blast furnace slag used in this embodiment 2 The content is 28.8%, and the temperature is 1370°C; the specific operation is as follows:
[0033] (1) Import 15t of blast furnace slag into an electric furnace with a capacity of 50t, and simultaneously add 860kg of iron mineral ferric oxide (the addition ratio is 4% of the amount of slag, based on the amount of iron added), so that the two are fully mixed.
[0034] (2) After the addition, start to heat up the electric furnace. After 30 minutes, the temperature is raised to 1520°C, and then 2.1t of anthracite is evenly added to the slag at a speed of 100kg / min (the addition is 14% of the slag mass, and the C content is about 90%, the ash content is 1%, and the 90% particle size is below 10mm), the temperature is maintained for 65 minutes, and the reaction is quenched in water after the end of the reaction.
[0035] During the reaction process, the expansion ratio ranges from 1.46 to 2....
Embodiment 2
[0037] The TiO of molten high-titanium-containing blast furnace slag used in this embodiment 2 The content is 27.9%, and the temperature is 1330°C; the specific operation is as follows:
[0038] (1) Import 15t of blast furnace slag into an electric furnace with a capacity of 50t, and simultaneously add 1700kg of iron mineral ferric oxide (the addition ratio is 8% of the amount of slag, based on the amount of iron added), so that the two are fully mixed.
[0039] (2) After the addition, the electric furnace starts to heat up, and after 30 minutes, the temperature rises to 1560°C, and then 2.1t of anthracite is evenly added to the slag at a speed of 100kg / min (the addition is 14% of the slag mass, and the C content is about 90%, the ash content is 1%, and 90% of the particle size is below 10mm), the temperature is maintained for 58 minutes, and the reaction is quenched in water after the end of the reaction.
[0040] During the reaction process, the expansion ratio ranges from ...