Preparation process of heat-preservation and heat-insulation gypsum for composite multifunctional wall

A technology of thermal insulation and preparation process, applied in the field of gypsum production, can solve the problems of not meeting the development requirements of new wall materials, low production capacity of production process, single function, etc., to reduce production costs and product defects, improve mechanical properties, The effect of improving the environment

Inactive Publication Date: 2022-01-04
泰山石膏(襄阳)有限公司
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The object of the present invention is to provide a heat-insulation type gypsum preparation process for composite multifunctional walls, to solve the problem that the existing gypsum for walls in the market proposed by the above-mentioned background technology has a low production process capacity , high production cost, single function, does not meet the current development requirements of new wall materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] A heat-insulation type gypsum preparation process for composite multifunctional walls, comprising the following production steps:

[0029] (1) Preparation of raw materials: Prepare an appropriate amount of desulfurized gypsum, reinforcing materials and additives. The reinforcing materials include modified diatomite, fly ash and polypropylene fibers, and the additives include crystal stabilizers, retarders, water reducing agents and water retention agent, the weight percentage of raw materials is 60% of desulfurization gypsum, 5% of modified diatomite, 5% of fly ash, 11% of polypropylene fiber, 10% of crystal stabilizer, 3% of retarder, 3% of water reducer, 3% water retaining agent, wherein the crystal stabilizer is made through the following steps:

[0030] 1) Preparation of sodium phosphate solution: put a certain quality of soda ash into the neutralization reactor A with a screw conveyor, and at the same time inject a certain quality of process water with a screw pump...

Embodiment 2

[0039] A heat-insulation type gypsum preparation process for composite multifunctional walls, comprising the following production steps:

[0040] (1) Preparation of raw materials: Prepare an appropriate amount of desulfurized gypsum, reinforcing materials and additives. The reinforcing materials include modified diatomite, fly ash and polypropylene fibers, and the additives include crystal stabilizers, retarders, water reducing agents and water retention agent, the weight percentage of raw materials is 50% of desulfurized gypsum, 10% of modified diatomite, 15% of fly ash, 16% of polypropylene fiber, 5% of crystal stabilizer, 1% of retarder, 1% of water reducer, 1% water retaining agent, wherein the crystal stabilizer is made through the following steps:

[0041] 1) Preparation of sodium phosphate solution: put a certain quality of soda ash into the neutralization reactor A with a screw conveyor, and at the same time inject a certain quality of process water with a screw pump, ...

Embodiment 3

[0050] A heat-insulation type gypsum preparation process for composite multifunctional walls, comprising the following production steps:

[0051] (1) Preparation of raw materials: Prepare an appropriate amount of desulfurized gypsum, reinforcing materials and additives. The reinforcing materials include modified diatomite, fly ash and polypropylene fibers, and the additives include crystal stabilizers, retarders, water reducing agents and water retention agent, the weight percentage of raw materials is 55% of desulfurization gypsum, 12% of modified diatomite, 8% of fly ash, 10% of polypropylene fiber, 7% of crystal stabilizer, 2% of retarder, 2% of water reducer, 2% water retaining agent, wherein the crystal stabilizer is made through the following steps:

[0052] 1) Preparation of sodium phosphate solution: put a certain quality of soda ash into the neutralization reactor A with a screw conveyor, and at the same time inject a certain quality of process water with a screw pump...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a preparation process of heat-preservation and heat-insulation gypsum for a composite multifunctional wall. The preparation process comprises the following production steps: preparing raw materials, crushing desulfurized gypsum, mixing reinforcing materials, mixing additives and preparing gypsum powder. According to the preparation process of the heat-preservation and heat-insulation gypsum for the composite multifunctional wall, a special reinforcing material is arranged, modified diatomite in the reinforcing material can improve the physical structure of a finished gypsum wall surface and increase the micropore structure of the gypsum wall surface, strong water-retention and heat-insulation performance is achieved, coal ash is beneficial to adsorption of peculiar smell in indoor space, the indoor environment is improved, and the reduction of formaldehyde pollution is promoted; and polypropylene fibers are good flame retardant fibers, the good flame retardant fireproof performance for the wall body is endowed, the binding force between the gypsum can be increased, the structural strength of the gypsum wall surface is improved, and a toxic substance is not added or produced during the production process.

Description

technical field [0001] The invention relates to the technical field of gypsum production, in particular to a heat-insulating gypsum preparation process for composite multifunctional walls. Background technique [0002] The Outline of the Building Materials Industry Development Plan proposes to vigorously develop new types of wall materials that are environmentally friendly and energy-saving. It is necessary to coordinate the production of building materials and energy-saving buildings, and vigorously develop thermal insulation functional materials. Accelerate the development of building envelope materials such as new wall materials and energy-saving doors and windows. Actively develop and produce new wall materials; make full use of various industrial wastes and vigorously develop environmentally friendly new wall materials. Focus on the development of composite multifunctional wall materials, accelerate the elimination of solid clay bricks, gradually increase the proportio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): C04B28/14C04B14/08C04B16/06C04B24/14C04B111/28
CPCC04B28/144C04B40/0039C04B14/08C04B16/0633C04B2111/00025C04B2111/28C04B18/08C04B2103/22C04B2103/302C04B2103/465C04B2103/0068C04B22/16C04B24/14C04B24/04
Inventor 卢保举周晓筠尚永东张松王攀
Owner 泰山石膏(襄阳)有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products