Production method of 5-series aluminum alloy strip
A technology of aluminum alloy strip and production method, which is applied in the field of aluminum alloy, can solve the problems of reducing usage, increasing the service life of materials, reducing costs, etc., and achieves the effect of improving the formability and strength of materials, improving performance, and meeting product quality requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] The state of the alloy described in this embodiment: 5754 / F, the thickness of the finished product: 2.5mm, adopt the following technical route: melting and casting→sawing and milling→heating→hot rough rolling→hot finish rolling→rapid cooling→bending / stamping, wherein, specifically The process parameters are as follows:
[0029] 1) Melting and casting: the mass fraction of the chemical composition of the ingot after melting and casting is Si: 0.06%, Fe: 0.21%, Cu: 0.06%, Mn: 0.22%, Mg: 2.8%, Cr: 0.25%, Zn: 0.109 %, Sc: 0.2%, Zr: 0.1%, the balance is Al; melting temperature 750°C, refining temperature 745°C, DC casting speed 56mm / min, casting temperature 720°C, water temperature 20-30°C; ingot thickness 480mm ×Width 1680mm.
[0030] 2) Sawing and milling: ingot gate sawing 50mm, dummy head sawing 250mm, large face milling 12mm, side milling 7mm.
[0031] 3) Heating: In the heating process, the heating temperature is 460° C., and the holding time for the metal to warm is...
Embodiment 2
[0036] The present embodiment comprises most of the operation steps of embodiment 1, and its difference is:
[0037] 4) Hot rough rolling: 15 passes of hot rough rolling, the rolling speed of the first 11 passes is 6m / s, the rolling speed of the last four passes is 0.5m / s, the thickness of the intermediate billet is 32mm, the rolling temperature of the intermediate billet is 445°C, The down rate is 35%.
Embodiment 3
[0039] The present embodiment comprises most of the operation steps of embodiment 1, and its difference is:
[0040] 4) Hot rough rolling: 15 passes of hot rough rolling, the rolling speed of the first 11 passes is 3m / s, the rolling speed of the last four passes is 0.5m / s, the thickness of the intermediate billet is 32mm, the rolling temperature of the intermediate billet is 445°C, The down rate is 35%.
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com