A construction method and cast-in-situ pile technology, applied in chemical instruments and methods, sheet pile walls, directional drilling, etc., can solve problems such as low drilling efficiency, drilling deviation, and enlarged drilling deviation, and achieve significant comprehensive economic benefits , shorten the construction period, and avoid the effect of mechanical use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] A large-diameter cast-in-place hard rock rotary digging guide drill bit includes an upper centralizing drill bit 1 and a lower centralizing drill bit 2. The upper centralizing drill bit 1 includes an upper centralizing guide section 11 and a rotary drilling barrel arranged below the upper centralizing guide section 11. 12. The upper centralizing guide section 11 is connected to the rotary drilling barrel 12 through the drill rod 13, and the bottom of the rotary drilling barrel 12 is provided with cutting teeth 14; specifically, the upper centralizing guiding section 11 is positioned in a short cylindrical shape Guiding device; the diameter of the upper centralizing guide section 11 is larger than the diameter of the rotary drilling barrel 12;
[0050] The lower centralizing bit 2 includes a roller cone drill pipe 22 and a lower centralizing guide section 21 arranged below the roller cone drill pipe 22. The righting guide section 21 is a drill tube with pick teeth 23, an...
Embodiment 2
[0060] A construction method for large-diameter cast-in-situ pile hard rock rotary excavation guided graded hole expansion, comprising the following steps
[0061] S1. Pile position measurement and stakeout
[0062] 1) Use excavators to level and compact the construction site before construction;
[0063] 2) The surveying engineer shall stake out the site according to the layout plan of the pile position, and mark the position of the pile on the ground with wooden piles or welding rods;
[0064] 3) The constructor stretches the cross line according to the staked pile position, and places 4 control piles at the end of the line as the positioning reference point of the outer casing.
[0065] S2, BG46 high torque rotary drilling rig in place
[0066] 1) Since the maximum design diameter of the cast-in-place pile in this project is Φ2400mm, it is necessary to configure a high-torque rotary drilling rig for secondary reaming for soil layer drilling construction. The power is 570...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 