Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

9results about How to "Stability Guarantee" patented technology

Steel structure welding clamp

The utility model belongs to the technical field of clamps, and particularly relates to a steel structure welding clamp which comprises a supporting seat, two symmetrically-arranged movable grooves are formed in the top of the supporting seat, different-direction moving plates are slidably mounted in the two movable grooves, the moving directions of the two different-direction moving plates are opposite, and the upper ends of the different-direction moving plates stretch out of the movable grooves; and clamping cylinders are rotationally mounted on the parts, located outside the movable grooves, of the different-direction moving plates, and the two clamping cylinders are arranged at the same height. In the welding process, a working motor enables a second rotating rod to rotate through meshing transmission of a first bevel gear and a second bevel gear, and enables a first rotating rod to rotate synchronously under connection of a cross-shaped sliding rod, and then two circular gears drive two ring gears to rotate respectively so that a fixed steel pipe can rotate by a certain angle. And different positions of a welding area can be conveniently operated, the welding quality is guaranteed, and the efficiency is improved.
Owner:HENAN ZHONGBANG STEEL STRUCTURE ENG CO LTD

Channel opening opening and closing device and battery replacing station comprising same

The utility model discloses a passage opening opening and closing device and a battery swap station comprising the same, the passage opening opening and closing device comprises a passage opening for battery swap equipment to enter and exit from a charging area, a mounting door frame, a lifting door which is arranged on the mounting door frame and can open and close the passage opening, and a transmission mechanism, the transmission mechanism is arranged in the mounting door frame and comprises a plurality of transmission wires and a guide wheel, one end of each transmission wire is connected to the lifting door, and the other end of each transmission wire passes through the transmission surface of the guide wheel and then is connected to a lifting driving mechanism or a counterweight mechanism of the channel opening opening and closing device; roller grooves corresponding to the transmission wires in number are formed in the surface of the guide wheel, are arranged in parallel and are used for accommodating the corresponding transmission wires respectively; and the limiting mechanism is arranged on the guide wheel and used for limiting the transmission wire to be separated from the roller groove. And a plurality of transmission wires are used for realizing connection with the overhead door, so that the overhead door can normally ascend and descend.
Owner:AULTON NEW ENERGY AUTOMOBILE TECHNOLOGY CO LTD +1

Maintenance device for long-span bridge railings with folding ladders and protective fences

ActiveCN224620427Ureduce volumestable support
This utility model relates to the field of construction safety technology and discloses a maintenance device for a large-span bridge railing with a folding ladder and protective railing. The device includes a ladder, a folding hanging ladder, a protective cage, and a support assembly. The folding hanging ladder is installed at the top of the ladder and can be folded to fit the ladder when not in use, reducing its size. When in use, it is unfolded to support the railing, providing stable transition support for climbing. The protective cage is fixed to the side of the ladder with bolts, forming a ring-shaped protective structure to prevent falls. The support assembly contains multiple evenly arranged support platforms, which are automatically retracted via connecting rollers, assembly cylinders, and coil springs. Normally, the coil springs keep the support platforms close to the ladder; when in use, stepping on a support platform overcomes the spring force to unfold it, and a limiting platform prevents excessive flipping, ensuring stable support and providing a place for maintenance personnel to stop and operate. All components are foldable and detachable, saving manpower and resources for transportation. Installation only requires unfolding and fixing; it occupies little space when not in use and can be flexibly transferred to different bridges, adapting to the maintenance needs of multi-span bridges. This improves convenience and safety.
Owner:CHINA RAILWAY NO 3 GRP CO LTD +1

Solid waste wave-absorbing concrete aggregate, preparation method and concrete

The invention relates to the technical field of building materials, in particular to solid waste wave-absorbing concrete aggregate, a preparation method and concrete.The solid waste wave-absorbing concrete aggregate is prepared from, by weight, 18%-22% of coal gangue, 4%-6% of lithium slag, 8%-12% of steel slag with the particle size ranging from 0 mm to 5 mm, 17%-23% of steel slag which is subjected to hydrophobic treatment and has the particle size ranging from 5 mm to 10 mm and 40%-50% of steel slag which is subjected to carbonization treatment and has the particle size ranging from 10 mm to 20 mm. According to the aggregate, the preparation method and the concrete, the problem of poor stability can be effectively solved, and the concrete is higher in strength and better in wave absorbing performance.
Owner:JIAHUA SPECIAL CEMENT

Novel cement prepared by recycling waste residues and preparation method of novel cement

PendingCN119661170AImprove early strength performanceHigh compressive strengthCement productionFiberPolyvinyl alcohol
The invention relates to novel cement prepared by recycling waste residues and a preparation method thereof, and relates to the technical field of waste residue recycling, the novel cement comprises the following components by mass: 30-50 parts of composite modified waste residues, 3-5 parts of modified polyvinyl alcohol fiber, 30-50 parts of cement clinker, and 0.5-1.5 parts of a water reducer; the composite modified waste residue is prepared from the following raw materials: composite waste residue, an ion-doped mineralizer and a composite excitant. The preparation method comprises the following steps: mixing the composite modified waste residue and the water reducing agent, stirring, adding the cement clinker, carrying out dry mixing, adding the modified polyvinyl alcohol fiber, and stirring to obtain the novel cement prepared by recovering the waste residue. The cement has the effect of improving the early strength performance of the novel cement prepared by recycling the waste residues, and the cement has good compressive strength and stability.
Owner:SUZHOU TONA SUPERFINE POWDER CO LTD

A weather-resistant power cable material and preparation method thereof

The invention discloses a weather-resistant power cable material and a preparation method thereof, relates to the technical field of cable materials, and is made of the following components: polypropylene resin, phosphaphenanthryl biphenyl polyurethane functional polymer, fluorosilicone thermoplastic polyurethane elastomer, 2-acrylamide-2-methylpropanesulfonic acid, bis(1-vinyl imidazole-2-) ketone, 3-(1,1-difluoro-2-propylene-1-yl)-2(1H)-quinoxalinone, ethylene acrylic elastomer, triallyl isocyanurate, coupling agent, filler, antioxidant, lubricant, compatibilizer, environmentally friendly plasticizer, initiator, polyphosphoric acid, phosphorus pentoxide. The weather-resistant power cable material has good flame retardancy, good weather resistance, sufficient mechanical and mechanical properties and performance stability, and long service life.
Owner:JIANGSU DONGFENG CABLE

A device and method for detecting the anti-cracking performance in concrete production

This invention relates to the field of concrete performance testing, specifically disclosing a device and method for testing the crack resistance of concrete during production. The device includes a mold with a pressure-applying component above it. The pressure-applying component applies downward pressure to the top of a solidified concrete block within the mold. The mold includes a frame and a base plate. A crack inducer is installed on the base plate. The frame and base plate can move vertically and horizontally, allowing the base plate to extend above the frame, thus ejecting the concrete block. A top plate is located above the mold, with an adjusting block slidably mounted in the middle of the top plate. The sliding direction of the adjusting block is perpendicular to the crack inducer and located in the middle of the crack inducer. The pressure-applying component is installed in the middle of the adjusting block. Clamps are installed at both ends of the top plate to hold the concrete block. This invention overcomes the limitations of existing testing devices and evaluation systems that are disconnected. By integrating early cracking tests and later mechanical loading functions on the same equipment, it achieves continuous evaluation of concrete under the coupled effects of internal and external stresses.
Owner:TAIYUAN GUANGSHA GUOXINGRONG CONCRETE CO LTD

Shield jig and gas shield arc welding device

A shielding includes a first outer shell member that surrounds a welding torch, is disposed to form a radial gap from the welding torch, and is configured to define a first annular space having a first opening in a bottom portion thereof, a first gas supply member disposed to surround the welding torch inside the first outer shell member, and configured to supply a shielding gas to the first annular space, and a dispersing member disposed below the first gas supply member in the first annular space, and configured to disperse the shielding gas.
Owner:KOBE STEEL LTD

Medical ice bag sleeve convenient to use

A medical ice bag sleeve convenient to use comprises an ice bag outer sleeve body, an ice bag inner sleeve body is installed in the ice bag outer sleeve body in a sleeved mode, two first connecting belts and two second connecting belts are fixedly installed on the two side walls of the ice bag outer sleeve body respectively, and first pull belts are fixedly installed at one ends of the two first connecting belts; a second drawstring is fixedly mounted at one end of each of the two second connecting bands, a first magic tape is fixedly mounted on the first drawstring, and a second magic tape is fixedly mounted on the second drawstring. The ice bag inner sleeve body is made of the water-absorbable cloth, and the ice bag outer sleeve body is made of the waterproof cloth, so that after the ice bag inner sleeve body is arranged in the ice bag outer sleeve body, when the ice bag is used, water generated by ice cubes in the ice bag inner sleeve body can be absorbed by the inner layer of the ice bag inner sleeve body, and a pile of water cannot be accumulated on the ice bag inner sleeve body; the ice bag outer sleeve body outside the ice bag inner sleeve body is made of waterproof cloth, so that water is not easy to leak out, and the condition that a patient feels uncomfortable or a pillow is wetted is avoided.
Owner:邱丽莲 +2