Aluminum alloy rolled diamond plate and producing method thereof
A production method and checkered plate technology, applied in the direction of metal rolling, metal rolling, rolling mill control devices, etc., can solve the problems of high energy consumption and complicated process, and achieve the advantages of improving mechanical strength, simplifying process, and facilitating popularization and application Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Embodiment 1. An aluminum alloy rolled pattern plate and its production method,
[0025] (1) The composition of the aluminum alloy rolled checkered plate, expressed in parts by weight, is 0.001 part of Si, 0.50 part of Fe, 0.05 part of Cu, 1.0 part of Mn, 0.001 part of Mg, 0.1 part of Ni, 0.05 part of Zn, 0.001 part of Ti and the rest Amount of Al, a total of 100 parts;
[0026] During production, the mixed metal is smelted at 770°C for 5 minutes. When the charge is completely melted and reaches the melting temperature range, the slag is removed, and then thoroughly stirred. After the thorough stirring is ensured, when the melt temperature reaches 730°C, samples are taken and tested. Whether the ingredients are qualified; and carry out the first stirring at a speed of 50 rpm, stirring for 5 minutes; after the first stirring, stay for 10-15 minutes, wait for the charge to be fully dissolved, adjust the temperature to 740-760°C, and then stir for 5-10 minutes , to obtain...
Embodiment 2
[0031] Embodiment 2, an aluminum alloy rolled checkered plate and its production method, the same as embodiment 1 will not be repeated, the difference is:
[0032] (1) Composition: 0.20 parts of Si, 0.001 parts of Fe, 0.12 parts of Cu, 1.3 parts of Mn, 0.05 parts of Mg, 0.001 parts of Ni, 0.001 parts of Zn, 0.03 parts of Ti and the balance Al, totaling 100 parts; Melting at ℃ for 5min,
[0033] (2) Refining with nitrogen and chlorine mixed gas for 20 minutes under the condition of 740°C, and standing for 9 hours, the standing temperature is 750°C. Under the conditions of the front box temperature of 715°C and the speed of 1000mm / min, blanks with a thickness of 7.0-7.8mm are produced;
[0034] (3) The rough material is rolled to a thickness of 2.50mm through 2 to 4 passes of a four-fold cold rolling mill at a medium temperature of 60°C; the rolling speed is 100m / min;
[0035] (4> After stretching and straightening the rolled checkered plate, quench it at 410°C for 10h.
Embodiment 3
[0036] Embodiment three, an aluminum alloy rolled checkered plate and its production method, the same as embodiment one will not be repeated, the difference is:
[0037] (1) Composition: 0.005 parts of Si, 0.45 parts of Fe, 0.10 parts of Cu, 1.2 parts of Mn, 0.005 parts of Mg, 0.005 parts of Ni, 0.04 parts of Zn, 0.003 parts of Ti and the balance of Al and unavoidable impurities, totaling 100 parts; The mixture was melted at 760°C for 18 minutes,
[0038] (2) Refining at 750°C for 18 minutes, standing still for 11 hours, the standing temperature is 740°C. Under the conditions of head box temperature of 700°C and speed of 150mm / min, blanks with a thickness of 7.0-7.8mm are produced;
[0039] (3) Rolled to a thickness of 2.0-3.0mm by a quadruple cold rolling mill; the rolling speed is 10m / min;
[0040] (4>Quenching for 10h at 450°C.
PUM
| Property | Measurement | Unit |
|---|---|---|
| strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 