Horizontal top pipe ground treatment construction method
A foundation treatment and pipe jacking technology, which is applied in foundation structure engineering, construction, sheet pile walls, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] The horizontal pipe jacking foundation treatment method of the present invention includes:
[0019] 1) Excavate the working well according to the influence of surrounding structures and the minimum construction length;
[0020] 2) Determine the pipe jacking point and the pipe jacking axis according to the designed horizontal pipe jacking axis position;
[0021] 3) According to different boundary conditions, the passive earth pressure calculation formula in Coulomb's earth pressure theory is selected to calculate the required passive earth pressure to determine the reaction force back, and the back reaction force is required to be greater than the pipe jacking force;
[0022] 4) Install the guide rail;
[0023] 5) Select the appropriate oil cylinder according to the engineering conditions (the main parameters are jacking force and stroke); the jacking force of pipe jacking can be determined according to the formula 6.4.8 of "Code for Construction and Acceptance of Water...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com