Ground strengthened high pressure rotary spraying pile construction technique
A technology for high-pressure rotary jetting piles and construction technology, which is applied in infrastructure engineering, sheet pile walls, buildings, etc., can solve the problems of high equipment loss, long construction period, low construction efficiency, etc., and achieves low equipment loss, low cost, The effect of high construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment example 1
[0022] This project is the foundation reinforcement project of Ningbo Steel Plant. The construction site is rectangular, with a length of more than 600 meters and a width of 24 meters. There are two conveyor belt foundations on each side, and the pile position is about 20cm away from the foundation. The total construction period is 90 days; the pile type adopts high-pressure rotary grouting piles, the pile length is 5-14.5 meters, the pile diameter is 800mm, and the spacing is 1.5 meters. Geological conditions, the surface layer is a backfilled pond residue layer of about 2.5-4 meters, which is relatively dense, and the lower layer is a silty clay layer. The design intention is to cement the entire site into blocks, increase the bearing area and improve the bearing capacity.
[0023] Difficulties in construction: The slag layer is high and spray piles are difficult to form holes, and it is difficult to drill down, the construction period is tight, the piles on both sides are c...
Embodiment example 2
[0052]This project is a dock expansion project of Zhejiang Jungang Shipyard. The main pile type adopts high-pressure rotary spraying, with a pile diameter of 1.2m and a pile length of 5-12m. Geological conditions: the water depth is 8 meters, the thickness of the concrete foundation under the water is 2.5 meters, the backfill gravel layer is 1-2 meters, and the bottom is bedrock. The design intention is to cement the gravel layer at the bottom of the concrete through high jetting piles, so as to prevent the layer from penetrating under the strong water pressure of seawater during construction, which will cause construction difficulties.
[0053] Difficulties in construction: the main hole is difficult to penetrate the concrete layer and gravel layer of 2.5 meters.
[0054] In order to solve this difficult problem in the project, we have adopted the drilling rig leading hole technology after research. According to the characteristics of this project, the brief steps and precaut...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com