Intelligent controlled electric heating pavement ice and snow removing process
An electric heating, intelligent control technology, applied in the direction of roads, roads, pavement details, etc., can solve the problems of pavement structure corrosion, low energy utilization rate, water resources pollution, etc. high rate effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
specific Embodiment approach 1
[0028] Specific implementation mode 1: An intelligent control electric heating road surface deicing and snowing process of this embodiment, for asphalt pavement, the described deicing and snowing process is completed by the following steps:
[0029] 1. Embed heating ribs in the asphalt pavement; the specific embedding steps are as follows:
[0030] a. Treat the underlayment at 5cm-7cm below the road surface: for the newly paved asphalt pavement, use a road roller to level it; for the old road surface, level it by milling or use new asphalt concrete to level it ;
[0031] b. Spread sticky layer oil: spread a layer of sticky layer oil on the lower bearing layer treated in step 1 (strengthening interlayer bonding);
[0032] In this embodiment, the viscous layer oil can be liquid asphalt or emulsified asphalt, if the underlying layer is an asphalt layer, the amount of liquid asphalt is 0.3L / m 3 ~0.5L / m 3 , the amount of emulsified asphalt is 0.3L / m 3 ~0.6L / m 3 ; If the underl...
specific Embodiment approach 2
[0040] Specific embodiment 2: In this embodiment, in step 1-c, the distance between two adjacent steel bars is 15cm-20cm (used to fix the heating bars). This can not only avoid the waste of resources caused by too dense steel mesh, but also avoid the uneven heat dissipation of the heating ribs caused by too thin steel mesh, and it is also conducive to the interlayer bonding of the road surface. Other steps are the same as in the first embodiment.
specific Embodiment approach 3
[0041] Specific embodiment three: In the c of step one in this embodiment, the steel mesh is fixed on the road surface that is sprinkled with sticky layer oil with several steel nails through the nodes of the steel mesh, and the distance between two adjacent steel nails is adjacent. An integer multiple of the spacing between two steel bars. So designed, the nodes of the steel mesh can be fixed to effectively stabilize the steel mesh on the road. Other steps are the same as in the first embodiment.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com