Leakage-proof type temporary blockage additive for low-pressure thin oil well

A temporary plugging agent and oil well technology, applied in the direction of drilling compositions, chemical instruments and methods, etc., can solve the problems of reduced fluid production, well plugging, well solidification, etc., and achieve the effect of low cost

Active Publication Date: 2012-07-11
PETROCHINA CO LTD
View PDF5 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the process of realizing the present invention, the inventors found that the prior art has at least the following problems: the polyacrylamide gel system type temporary plugging agent is not easy to degrade and destroy, and it is very easy to damage the formation in the operation of thin oil wells, resulting in a decrease in permeability , resulting in a decrease in liquid production, or even blocking the well, and the polyacrylamide gel shear fragments are easy to get stuck in the pump, affecting the normal production of the oil well; the oil-soluble temporary plugging agent is more expensive, and the well is easily blocked if the amount is large , the dosage is small, it cannot achieve temporary plugging effect, and it is difficult to implement on site. It can only be used in low-permeability reservoirs with little formation deficit.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0013] This embodiment provides an anti-leakage temporary plugging agent for low-pressure thin oil wells.

[0014] Temporary plugging agent raw material formula:

[0015] 0.04-0.06 tons of hydroxypropyl guar gum, 0.02-0.04 tons of organic titanium, 0.5-1 tons of petroleum resin, 0.03-0.05 tons of dodecyl dimethyl betaine, 0.01 tons of sodium sulfite, and 0.002-0.004 tons of ammonium persulfate And 8.85-9.35 tons of water.

[0016] The functions of the main components in the anti-leakage temporary plugging agent for low-pressure thin oil wells provided in this embodiment are as follows:

[0017] Hydroxypropyl guar gum and organic titanium are cross-linked to form a gel system. The embodiment of the present invention selects hydroxypropyl guar gum because compared with other plant gums, such as squash gum, hydroxypropyl guar gum and organic titanium The cross-linking is more thorough, and the cross-linking reaction can be completed quickly, so the gelation time of the gel syst...

Embodiment 2

[0026] Temporary plugging agent raw material formula:

[0027] 0.2 tons of hydroxypropyl guar gum, 0.1 tons of organic titanium, 2.5 tons of petroleum resin, 0.15 tons of dodecyl dimethyl betaine, 0.05 tons of sodium sulfite, 0.01 tons of ammonium persulfate and 44.25 tons of water.

[0028] Well Hainan 10-4 currently has 6 gas layers in the production zone, all with a permeability of 1000×10 -3 μm 2 Above, the maximum permeability is 3028.1×10 -3 μm 2 In the past, the leakage was very serious during well flushing, and there was basically no liquid return during hot flushing, and the casing pressure was still negative after well flushing; during the operation of well flushing, there was no liquid return after 10 trucks and 150 square meters of well flushing. On June 4, 2009, the temporary plugging agent was used for temporary plugging, 45 cubic meters of temporary plugging agent was squeezed in, and then replaced with clean water, the pressure reached 2.0MPa, and normal wel...

Embodiment 3

[0030] Temporary plugging agent raw material formula:

[0031] 0.24 tons of hydroxypropyl guar gum, 0.12 tons of organic titanium, 3 tons of petroleum resin, 0.18 tons of lauryl dimethyl betaine, 0.048 tons of sodium sulfite, 0.012 tons of ammonium persulfate and 45 tons of water.

[0032] Well Hainan 19-9 was washed with 30 trucks during the overhaul at the end of 2008, and a total of 450 cubic meters of liquid did not return. Before the sand washing operation on October 12, 2009, the temporary plugging agent was used for temporary plugging, and the temporary plugging agent was squeezed in for 50 The pressure reaches 6.0MPa, which meets the sand washing pressure requirement. After the operation is completed, the well sees oil after 3 days of drainage, and reaches the production level before the operation 2 days after the completion of the drainage. Currently, the well is in good production condition. After the operation, there was no accident of rubber-breaking fragments stuc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
softening pointaaaaaaaaaa
Login to view more

Abstract

The invention discloses a leakage-proof type temporary blockage additive for a low-pressure thin oil well, which belongs to the field of workover treatment for a thin oil well in petroleum industry. The temporary blockage additive comprise the following raw materials in weight percentage: 0.4-0.6% of hydroxypropyl guar gum, 0.2-0.4% of organic titanium, 5-10% of petroleum resin, 0.3-0.5% of dodecyl dimethyl betaine, 0.1% of sodium sulfite, 0.02-0.04% of ammonium persulfate and 88.5-93.5% of water. The leakage-proof type temporary blockage additive of the invention crosslinks the hydroxypropyl guar gum with the organic titanium to form a gel system, and at the same time adds a certain amount of petroleum resin to form a compound temporary blockage system. The temporary blockage system can immediately break gel without blocking off the oil well, and avoids the accident of stuck pump caused by broken gel fragment. In addition, the leakage-proof type temporary blockage additive has the advantages of no pollution, no harm to a reservoir and low cost.

Description

technical field [0001] The invention relates to the field of thin oil well workover operations in the petroleum industry, in particular to an anti-leakage temporary plugging agent used in low-pressure thin oil wells. Background technique [0002] In the production of low-pressure thin oil wells, due to long-term exploitation, there will be a certain degree of deficit in the formation, so in the process of operation and well washing, a large amount of well killing fluid and well washing fluid will enter the reservoir, so the production of low-pressure thin oil wells often There will be serious leakage problems. After the well killing fluid and well flushing fluid enter the reservoir, it is easy to hydrate and expand the clay minerals, causing water sensitive damage to the reservoir, resulting in a decrease in the permeability of the reservoir, and making it difficult to drain the fluid. Temporary blocking is required. [0003] At present, there are mainly two types of tempo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): C09K8/514
Inventor 许占双李峰刘占广李德胜赵跃鹏李友富浦家康孙倩茹程方柳荣伟崔彪刘雪梅徐爽周月惠张军峰李宗强张春茹
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products