Water-emulsified chloroprene rubber modified asphalt waterproof paint and preparation method thereof
A chloroprene rubber and modified asphalt technology, applied in asphalt coatings, chloroprene homopolymer coatings, coatings, etc., can solve the problems of bridge deck asphalt concrete pavement damage, pits, swells, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0016] Water-emulsion type neoprene rubber modified bitumen waterproof coating and its preparation method, its raw material formula is composed of: 15-20 parts of petroleum asphalt; 25-35 parts of neoprene latex; 1-2 parts of resin; 1-1.5 parts of auxiliary agent , including: emulsifiers, stabilizers, film-forming aids, thickeners, dispersants, anti-settling agents; 0.5-0.8 parts of regulators, including: defoamers and 0.1-0.2 parts of pH regulators; defoamers It includes 0.2-0.6 parts of silicone defoamer and 0.2 parts of tributyl phosphate; 0.3-0.4 parts of plasticizer; 0.01-0.02 parts of vulcanizing agent; 5-10 parts of functional powder; 30-50 parts of water.
[0017] The preparation method of water emulsion type chloroprene rubber modified asphalt waterproof coating:
[0018] (1) Add 15-20 parts of petroleum asphalt into mixing tank A, slowly raise the temperature to 180°C, then cool down to 160-170°C, add 0.3-0.4 parts of plasticizer (for resin), 1-2 parts of resin , ma...
Embodiment 2
[0026] Below in conjunction with embodiment describe its construction method in detail:
[0027] (1) Preparation of construction tools: Mixing buckets, spraying machines or special bristle brushes should be prepared before construction.
[0028] (2) Requirements for the base course: the strength of bridge deck and beam concrete reaches the design mark, and the surface must not have loose laitance, peeling, hollowing and severe cracking. The flatness of the surface shall meet the requirements of the bridge specification. The elevation of the upper opening of the vertical drainage pipe shall be lower than that of the base layer. The outlet must be firmly installed with the base layer without any looseness.
[0029] (3) The base layer should be clean, dry and free of water.
[0030] (4) Base treatment: the base surface should be free of dust, floating ash, impurities, oil stains, etc. Before making the waterproof layer, the surface can be cleaned with air compressor, water purif...
PUM
Property | Measurement | Unit |
---|---|---|
thermal resistance | aaaaa | aaaaa |
elongation at break | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com