An installation method and hanging technology, which is applied in chemical instruments and methods, water/sludge/sewage treatment, biological water/sewage treatment, etc., can solve the problems of high risk, large amount of engineering, high cost, etc., and reduce construction costs. Difficulty, reduced construction cost, not easy to slip and fall off
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] After demonstration, a village decided to use biological technology to treat its domestic sewage. Considering that there were no specialized technical personnel for 24-hour operation management after acceptance and handover, it decided to use biofilm method to reduce the dependence on technology. The designed treatment water volume is 5m 3 / h, the length of the biological oxidation tank is 5.0m, the width is 2.0m, the effective water depth is 2.8m, the height of the packing layer is 2.0m, and the lower end of the packing layer is 0.5m from the bottom of the pool.
[0029] The project adopts the national standard 8# angle iron as the main support for the filler, and installs and fixes it at 0.5m and 2.5m from the bottom of the pool on both sides of the inner wall of the pool in the length direction (a total of 4 pieces in one pool). Drill holes on the angle iron at an equidistant distance of 20cm, the hole diameter is φ12 (mm), and pass the φ8 (mm) seawater rope (nylon r...
Embodiment 2
[0034] After demonstration, a market town decided to adopt the biological denitrification process to treat its domestic sewage. Considering the impact resistance of the system, it decided to adopt the biofilm method to ensure the biomass of the system. The designed treatment water volume is 50m 3 / h, the total length of the biological oxidation tank is about 50.0m, the width is 3.0m, the effective water depth is 2.8m, the height of the packing layer is 2.0m, and the lower end of the packing layer is 0.5m from the bottom of the pool.
[0035] The project uses the national standard 10# angle iron as the main support for the filler, and installs and fixes it at 0.5m and 2.5m from the bottom of the pool on both sides of the inner wall of each pool in the length direction (a pool has 4 pieces in total), and the angle iron bracket is fixed and installed. Finally, drill holes on the angle iron with a 15cm equidistant angle iron, the hole diameter is φ15 (mm), and pass the φ12 (mm) se...