Investment rapid casting process
A rapid casting and process technology, applied in the field of investment casting, can solve problems such as damage, part deformation, and affecting product quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] The rapid investment casting process includes the following steps:
[0020] The first step is to make an ice mold, so that the cavity of the ice mold is exactly the same shape as the casting, and the ice mold is a double-layer structure, and a cavity is formed between the double-layer structures;
[0021] The second step is to prepare ceramic slurry;
[0022] The third step is to pour the parting agent into the cavity of the ice mold under the environment of -10℃~-5℃, pour out all the parting agent after filling, and put the spiral strip asbestos in the cavity Pull rope with a width of 15mm and a helix pitch of 30mm to fill the cavity with ceramic slurry;
[0023] In the fourth step, the ceramic slurry is placed in an environment of -10°C to -5°C for 1 to 2 hours to fully gel the slurry;
[0024] The fifth step, after the ceramic slurry is fully gelled, take it out and place it at room temperature, and the ice mold will melt naturally to obtain a ceramic shell;
[00...
Embodiment 2
[0030] The rapid investment casting process includes the following steps:
[0031] The first step is to make an ice mold, so that the cavity of the ice mold is exactly the same shape as the casting, and the ice mold is a double-layer structure, and a cavity is formed between the double-layer structures;
[0032] The second step is to prepare ceramic slurry;
[0033] The third step is to pour the parting agent into the cavity of the ice mold under the environment of -10 ℃, pour out all the parting agent after filling, and put a spiral strip asbestos pull rope in the cavity, the width is 15mm, and the screw pitch is 30mm, fill the cavity with ceramic slurry;
[0034] In the fourth step, the ceramic slurry is placed at -10°C for 1 hour to fully gel the slurry;
[0035] The fifth step, after the ceramic slurry is fully gelled, take it out and place it at room temperature, and the ice mold will melt naturally to obtain a ceramic shell;
[0036] The sixth step is to bake the cera...
Embodiment 3
[0041] The rapid investment casting process includes the following steps:
[0042] The first step is to make an ice mold, so that the cavity of the ice mold is exactly the same shape as the casting, and the ice mold is a double-layer structure, and a cavity is formed between the double-layer structures;
[0043] The second step is to prepare ceramic slurry;
[0044] The third step is to pour the parting agent into the cavity of the ice mold under the environment of -5 ℃, pour out all the parting agent after filling, and put a spiral strip asbestos pull rope in the cavity, the width is 15mm, and the screw pitch is 30mm, fill the cavity with ceramic slurry;
[0045] In the fourth step, the ceramic slurry is placed at -5°C for 2 hours to fully gel the slurry;
[0046] The fifth step, after the ceramic slurry is fully gelled, take it out and place it at room temperature, and the ice mold will melt naturally to obtain a ceramic shell;
[0047] The sixth step is to bake the ceram...
PUM
Property | Measurement | Unit |
---|---|---|
width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com