Crack Control Method of Side Wall of Pipe Gallery Box Tunnel
A pipe gallery and tunnel technology, which is applied in the field of side wall crack control of a pipe gallery box tunnel, can solve the problems of large size of the cast-in-place buried tunnel, difficulty in pouring, large transverse section size, etc., so as to control cracks and appearance quality, Guaranteed service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] The present invention adopts the cast-in-place buried section tunnel in Waihai as the investigation and research object.
[0052] 1. Using segmental and distributed pouring technology
[0053] The design institute divides the cast-in-place buried section tunnel into 6 sections (respectively marked as CE1~CE6), and the cast-in-place buried section tunnel adopts a single-box double-chamber pipe gallery box-type structure or a single-box four-room pipe gallery box-type structure form. The section CE1 is connected to the immersed tube tunnel, and the section transitions from the standard section of the immersed tube to the double-chamber section of the cast-in-situ buried section, and CE6 returns to the double-chamber section and is connected to the open section.
[0054]The longitudinal length of each section (CE1~CE6) is designed to be 24.7~54m. In order to reduce the risk of concrete cracking, each section is further divided into 2~4 sections for pouring, and the sectio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


