An epoxy asphalt material and asphalt technology, which is applied in the proportioning of the material and its preparation field, can solve the problems of emulsified asphalt technical limitations, inability to cure, viscosity increase, etc., and achieve short operation time, reduce construction gas emissions, The effect of high fatigue life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Component A is a mixture of my country's brand bisphenol A epoxy resin E-51 and E-54 in a ratio of 1:2; component B consists of 31 parts by weight of asphalt, 0.5 parts by weight of emulsifier, and 6 parts by weight of Phthalic anhydride, 8 parts by weight of 2-methylimidazole, 10 parts by weight of triethylenetetramine, 4.5 parts by weight of tributyl phosphate and 40 parts by weight of water; Keep warm for 1 hour under the environment, and the temperature of stone and mineral powder are both at room temperature when mixing.
[0045] The mass ratio of component A to component B is 1:3.9.
[0046] Grading screening was carried out according to Table 1.
[0047] Table 1 AC-13 Mixing Ratio of Mixture
[0048] particle size
Embodiment 2
[0050] The emulsified epoxy asphalt material prepared by the present invention is formed by mixing two components, A and B. The A component is a Chinese brand bisphenol A epoxy resin E-51 (single component, no other brand); the B component By the pitch of 32 parts by weight, the emulsifier of 0.5 parts by weight, the phthalic anhydride of 5 parts by weight, the 2-methylimidazole of 6 parts by weight, the triethylenetetramine of 8 parts by weight, the tributyl phosphate of 3.5 parts by weight Esters and 45 parts by weight of water. Before mixing, before mixing, component A is kept at 30°C for 1 hour, and the temperature of stone and mineral powder is at room temperature during mixing.
[0051] The mass ratio of component A to component B is 1:4.1.
Embodiment 3
[0053] Ordinary base asphalt is emulsified to prepare conventional emulsified asphalt. The domestic Zhonghai No. 70 base asphalt is selected, and the asphalt index is shown in Table 2. Then carry out normal temperature mixing, all the other materials and process are with embodiment 1.
[0054] Table 2 Conventional indicators of base asphalt
[0055]
[0056] Carry out mixture design through Marshall method first, the target porosity of mixture in three kinds of embodiments is the same, is 4%, selects five kinds of asphalt dosages: 3.4%, 3.7%, 4.0%, 4.3% and 4.6%; Marshall compaction molding, void ratio calculation results are shown in Table 3.
[0057] Determination of asphalt consumption in three groups of embodiments of table 3
[0058] Asphalt consumption (%)
[0059] The emulsified epoxy asphalt of the present invention can be used for paving the asphalt upper layer in tunnels or low-temperature areas, and can also be used for paving middle surface layer, low...