Method for removing heavy metal by pretreated sludge
A pretreatment and heavy metal technology, applied in the direction of sludge treatment, multi-stage water treatment, water/sewage treatment, etc., can solve the problems of poor economy, complicated process, low adsorption efficiency, etc., and achieve low operating cost, simple process, and easy operation and the effect of easy control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] A method for removing heavy metals from pretreated sludge, the method comprising:
[0027] Step A, sludge pretreatment, release the organic substances in the sludge and form sludge solids;
[0028] Step B, mixing the pretreated sludge or its components with the heavy metal wastewater;
[0029] Step C, precipitation separation.
[0030] Further, step A includes
[0031] Step A1, the sludge concentration treatment of the sewage treatment plant, the retrieved sludge is allowed to settle freely for 6 hours to concentrate, and the sludge concentration is adjusted to 100g / L;
[0032] Step A2, pretreat the concentrated sludge. The sludge pretreatment methods include heat treatment, microwave treatment, ultrasonic treatment, acid-base treatment, high-voltage pulse electric field treatment, homogeneous treatment and mechanical crushing, and other methods that can dissolve the sludge. Any one or a combination of several cell treatment methods.
[0033] Further, the specific o...
Embodiment 2
[0038] The remaining sludge from the sewage treatment plant was concentrated by free precipitation, the sludge concentration was adjusted to 14g / L, the pH value of the sludge was adjusted to 13 with NaOH solution, heat treatment was carried out at 175°C for 70min, and then the sludge was heated at 8000r Centrifuge for 5min at 1 / min to separate the sludge solids from the supernatant, and finally mix the sludge supernatant with 30mg / LCu 2+ The solution was mixed 1:4 and kept shaking for 1h.
[0039] After removing the precipitate, Cu in the supernatant 2+ The concentration is 5.26mg / L, Cu 2+ The removal rate reached 82.5%.
Embodiment 3
[0041] The remaining sludge from the sewage treatment plant was centrifuged and concentrated, and the sludge concentration was adjusted to 200g / L. Ultrasonic treatment was performed with ultrasonic power of 1800W, frequency of 100kHz, and acoustic energy density of 1.0W / ml for 60 minutes. The sludge after ultrasonic treatment was mixed with 30mg / LPb 2+ The solution was mixed at a volume ratio of 1:10, and continuously oscillated and mixed for 1.5h, centrifuged at 5000r / min for 15min, the Pb in the supernatant 2+ The concentration is 1.48mg / L, Pb 2+ The removal rate reached 95.1%.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More