Portable nitrogen purging, leakage detection, vacuum pumping and inflation device and application method
An inflatable device and vacuum pumping technology, applied in container filling methods, cleaning methods using gas flow, mechanical equipment, etc., can solve the problems of inflatable purity and pressure that are difficult to control, cannot be carried around, and damage internal parts, etc., to achieve fast Simple gas path soft connection, improve accuracy and repeatability, save time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0067] Leak detection for ATN-NVM-14 night vision device
[0068] Connect the gas interface Ⅱ on the control box to the control valve of the night vision device through the plastic gas pipeline;
[0069] Turn on the power switch on the control box, the power indicator light is green, indicating that the control box is working normally, rotate the three-position air distribution valve to the nitrogen position, and set the digital pressure gauge to zero, indicating that the pressure in the plastic gas pipeline is zero. Complete the debugging of the equipment;
[0070] Move the three-position air distribution valve to the leak detection test position, the digital pressure gauge is connected to the gas cavity in the night vision device, and proceed in accordance with the procedure of the differential pressure leak detection method; the digital pressure gauge displays the pressure in the gas cavity of the night vision device It is 1.88atm, which is lower than the factory standard. After ...
Embodiment 2
[0074] Purge the ATN-NVM-14 night vision device with nitrogen
[0075] Screw the nitrogen source to the pressure regulator, and then connect the inflation valve on the pressure regulator to the gas connection I on the control box through the plastic gas pipeline, and connect the gas connection II on the control box to the gas pipeline through the plastic gas pipeline. Control valve connection of night vision device;
[0076] Turn on the power switch on the control box, the power indicator light is green, indicating that the control box is working normally, rotate the three-position air distribution valve to the nitrogen position, and set the digital pressure gauge to zero, indicating that the pressure in the plastic gas pipeline is zero. Complete the debugging of the equipment;
[0077] Manually open the gas path manual control valve on the nitrogen source, the high pressure gauge shows that the pressure of the nitrogen source is 89atm, then manually adjust the pressure adjustment h...
Embodiment 3
[0081] Vacuum and inflate the infrared telescope
[0082] Screw the nitrogen source to the pressure regulator, and then connect the inflation valve on the pressure regulator to the gas connection I on the control box through the plastic gas pipeline, and connect the gas connection II on the control box to the gas pipeline through the plastic gas pipeline. Control valve connection of night vision device;
[0083] Turn on the power switch on the control box, the power indicator light is green, indicating that the control box is working normally, rotate the three-position air distribution valve to the nitrogen position, and set the digital pressure gauge to zero, indicating that the pressure in the plastic gas pipeline is zero. Complete the debugging of the equipment;
[0084] Manual vacuuming: Move the three-position air distribution valve to the vacuum position, press the smart vacuum pump power switch, and repeatedly press the vacuum pump power switch after starting the smart vacuum...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Sensitivity | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 