Construction method for shield driving type empty pushing ground fracture bored tunnel

A technology for tunnel construction and ground fissures, applied in tunnels, earthwork drilling, mining equipment, etc., can solve the problems of difficult construction, high safety risks, and increased costs, and achieve low construction costs, simple method steps, and easy construction easy effect

Active Publication Date: 2016-11-23
CHINA RAILWAY FIRST GRP CO LTD +1
View PDF10 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The above-mentioned construction method mainly has the following defects: first, the weight of the section steel bracket and the starting reaction force frame is relatively large, and the hoisting, transportation and disassembly of the components are extremely inconvenient due to the space limitation of the underground excavation tunnel and the influence of vertical and horizontal transportation; 2. The reaction point of the shield digging the tunnel through the ground fissure is frequently changed, which seriously affects the transit time; moreover, it is necessary to set up the reaction fulcrum of the jack every 6 meters to 9 meters, and there are many fulcrums to be set. Due to the dual constraints of small curve radius and narrow space of underground excavation tunnels with ground fissures, the construction is difficult, safety risks are high, the cycle is lo

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for shield driving type empty pushing ground fracture bored tunnel
  • Construction method for shield driving type empty pushing ground fracture bored tunnel
  • Construction method for shield driving type empty pushing ground fracture bored tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0072] Such as figure 1 A shield excavation type air-push tunnel construction method through ground fissures is shown, comprising the following steps:

[0073] Step 1. Concrete guide platform construction in the ground fissure underground excavation tunnel: After the construction of the inverted arch 2 of the ground fissure underground excavation tunnel 1 is completed, the inverted arch 2 is backfilled to obtain the inverted arch backfill structure;

[0074] The backfill structure of the inverted arch is a concrete guide platform 9, and a push channel for the shield machine to push forward is provided in the middle of it. The concrete guide platform 9 is arranged along the longitudinal length of the ground fissure underground tunnel 1, see figure 2 ;

[0075] Step 2. Construction of guide rails and counterforce frames: Install a guide rail 3 on the left and right sides of the concrete guide platform 9 described in step 1 for the shield machine to push forward, and the two gu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention discloses a construction method for a shield driving type empty pushing ground fracture bored tunnel. The construction method comprises the following steps: 1) constructing a concrete guide platform in the ground fracture bored tunnel; 2) constructing a guide rail and a counterforce frame; 3) integrally forward pushing the shield tunneling machine: forward pushing the shield tunneling machine, supporting the shield tunneling machine on two guide rails, and utilizing a boosting cylinder of the shield tunneling machine and the counterforce frame to integrally forward push till being in place; in a pushing process, utilizing a shield segment assembling device for the shield tunneling machine to mount a plurality of shield segments on the concrete guide platform from back to front, wherein the shield segments are bottom segments and are located on the rear side of the boosting cylinder; supporting the boosting cylinder on the counterforce frame through the bottom segments, wherein the bottom segments form a trolley translation channel for forward moving the rear matched trolley of the shield tunneling machine. The method provided by the invention has the advantages that the steps are simple, the design is reasonable, the construction is simple and convenient, the use effect is good, the inverted arch backfill structure in the tunnel is utilized to simply and conveniently finish the construction process of the shield driving type empty pushing ground fracture bored tunnel and the construction process is safe.

Description

technical field [0001] The invention belongs to the technical field of shield tunnel construction, and in particular relates to a construction method of a shield excavation-type empty-push tunnel through ground fissures. Background technique [0002] Empty thrusting of the shield means that the shield machine moves forward without excavation after the commissioning of the shield machine is completed. When shield tunneling through ground fissures is started and arrived at the construction, brackets made of section steel are usually used to receive and start the shield machine into and out of the hole. The ground fissures tunnel refers to the underground Dig tunnels. Shield excavation tunnels through ground fissures usually adopt the construction method of disassembling the shield machine body and supporting trolleys and moving them separately. The shield machine body and the steel bracket are integrally pushed by jacks to excavate through ground fissures. In the tunnel, the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/06
CPCE21D9/06E21D9/0607
Inventor 梁西军张新义王江卡林建平蒋国军杨永强党西锋郑飞邵海清姚天全
Owner CHINA RAILWAY FIRST GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products