Large valve and large-diameter pipeline pre-assembly pup joint manufacturing and hoisting method

A hoisting method and pre-assembly technology, which is applied to pipeline systems, auxiliary devices, manufacturing tools, etc., can solve problems such as difficult quality assurance, many safety hazards in high-altitude operations, and large requirements

Active Publication Date: 2017-05-10
广西建工第五建筑工程集团有限公司
View PDF7 Cites 31 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. The process is cumbersome and the construction period is long;
[0005] 2. The high-altitude operation requires a large construction operation surface. The welding of large-diameter pipes and flanges, and the in

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large valve and large-diameter pipeline pre-assembly pup joint manufacturing and hoisting method
  • Large valve and large-diameter pipeline pre-assembly pup joint manufacturing and hoisting method
  • Large valve and large-diameter pipeline pre-assembly pup joint manufacturing and hoisting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0157] A large-scale valve and large-diameter pipeline pre-assembled short connection manufacturing and hoisting method, the manufacturing and hoisting method is to make a prefabricated section and a pre-assembled whole in a ground processing site, and then use a vertical transport machine to hoist the pre-assembled whole in place The method of butt welding with the installed overhead large-diameter pipeline;

[0158] Its technological process is:

[0159] Construction preparation→production of prefabricated section→production of pre-assembled whole→hoisting of pre-assembled whole→butt welding of pre-assembled whole and installed overhead pipeline→acceptance;

[0160] Specific steps include:

[0161] The first step, construction preparation

[0162] (1) Technical preparation

[0163] (1) Determine the short and large diameter pipeline prefabrication scheme based on the BIM model and pipeline single-line diagram, combined with the measured installation size, and adjust the p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a large valve and large-diameter pipeline pre-assembly pup joint manufacturing and hoisting method. The manufacturing and hoisting method is characterized in that a prefabricated segment and a pre-assembly entirety are manufactured in a ground machining field, and the pre-assembly entirety is hoisted in place with a vertical transportation machine to be connected with an installed overhead large-diameter pipeline in a butt-joint welding mode; the method comprises the technological processes of construction preparing, prefabricated segment manufacturing, pre-assembly entirety manufacturing, pre-assembly entirety hoisting, butt-joint welding of the pre-assembly entirety and the installed overhead pipeline and checking and accepting. The hoisting method has the advantages that the tedious and high-difficulty high-altitude operation process is simplified and completed in the ground machining field, and therefore the problems that in traditional construction, the construction processes are tedious, the construction period is long, the high-altitude operation construction operation surface requirement is high, and the welding and installing quality is difficult to guarantee are solved; the whole construction process is in a safe, stable and controllable state, the installation precision is high, the construction period can be shortened, the construction efficiency is improved, the labor and material cost is reduced, and the economic benefit is significant.

Description

technical field [0001] The invention relates to a pipeline installation and construction method, in particular to a method for making and hoisting a large-scale valve short-connected with a large-diameter pipeline and pre-assembled as a whole. Background technique [0002] With the increasingly severe global energy supply crisis and the increasing requirements of urban residents for indoor living and office environments, water source heat pump cooling and heating technology has received higher attention and development. Water source heat pump centralized cooling and heating can provide urban public buildings with The cold and heat source of the air conditioner adopts the form of electric refrigeration + river water source heat pump + ice storage system for cooling in summer, and the river water source heat pump for heating in winter. The cooling and heating range can reach 2 to 3 million square meters. [0003] Water source heat pump centralized cooling and heating projects ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): B23P15/00B23K37/00
CPCB23K37/00B23K2101/06B23K2101/10B23P15/00
Inventor 李林芳莫树攀朱洪涛林俊凌亚青
Owner 广西建工第五建筑工程集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products