Anticorrosion surfacing method for inner wall of steel pipe welding seam
A welding joint and pipe technology, which is applied in the field of anti-corrosion surfacing welding on the inner wall of steel pipe welding joints, can solve the problems of anti-corrosion technology losing its practicality, and achieve the effects of improving the efficiency of preheating operations, ensuring flatness, and ensuring anti-corrosion performance
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2017-05-24
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of steel pipe inner wall anticorrosion. The method is different from general steel wear-resistant surfacing welding and size recovery surfacing welding. A surfacing welding method, which is a technology for ensuring the continuity of the anticorrosion layer on the inner wall of a steel pipeline, and belongs to one of the main parts of the surfacing welding anticorrosion technology in the welding joint of a steel pipeline. method. Background technique
[0002] In the welding construction of steel pipelines, due to the influence of welding heat input, the internal anti-corrosion coating in the weld area of the pipeline is destroyed, and the microstructure of the weld metal is changed, resulting in a decrease in the corrosion resistance of the pipeline welds and a Corrosion of the inner wall area before the pipeline results in the leakage of the transport medium, which reduces the online service life of the ...
Examples
Embodiment Construction
[0061] (1) Install the steel pipe with anti-corrosion surfacing at the pipe end in advance on the wall-mounted floating turning machine, adjust the wall-mounted wheel to be elastically close to the outer wall of the steel pipe end, and adjust the distance between the inner hole turning tool and the outer diameter of the wall-mounted wheel to The required final wall thickness of the steel pipe, the inner wall of the floating turning steel pipe to the width of the surfacing layer specified in the design plus the width of the waste area, to ensure that the pre-surfacing surface is clean, free of rust, and free of oil such as ( figure 2 );
[0062] (2) Start the surfacing machine without wire feeding Figure 3-3 In the scrap area shown, arc preheating is performed on the end of the steel pipe for one or two weeks, so that the temperature of the outer wall of the end of the steel pipe meets the requirements of the surfacing process;
[0063] (three) in Figure 3-2 In the positio...