Coal mine drill hole deformation monitoring experimental method
A technology of deformation monitoring and experimental methods, which is applied in the directions of measurement, earthwork drilling and production, wellbore/well components, etc., can solve the problems of inability to monitor deep drilling deformation, etc., and achieve the effects of manpower saving, wide applicability and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention will be described in detail below in conjunction with the embodiments shown in the accompanying drawings.
[0022] Such as Figure 1 As shown, the present invention is used for the coal mine borehole deformation monitoring experiment method, which mainly consists of a coal body borehole 2, a PE pipe 3, a marking length 4, a grouting area 5 and a borehole peeping instrument 6. First drill a borehole 2 with a length of 21m and an aperture of 90mm at the coal rock side 1 of the air inlet lane. Prepare three sections of PE pipe 3 with a length of 7m and an outer diameter of 80mm. This PE pipe has certain compression resistance and good elasticity. When it encounters external pressure, it is easy to deform but not easy to damage, so that Used to record and detect drilling deformation. On the inner surface of the front end of the PE pipe, affix the identification length 4, which is about 50mm long. The borehole peeping instrument 6 is prepared for bor...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

