Displacement control system and application method of cable crane tower frame for arch bridge construction
A displacement control and cable technology, used in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as poor displacement control effect of towers, waste of materials, etc., to avoid repeated deformation of large displacement, avoid repeated deformation, ensure safety effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] This embodiment provides a displacement control system for cable crane towers in arch bridge construction;
[0036] Such as Figure 1-Figure 3 As shown, the arch bridge construction cable crane tower frame displacement control system in this embodiment includes a displacement detection device 2, a tensioning device and a controller, the displacement detection device 2 is arranged on the top of the tower 1, and the tensioning device is set At the anchor end of the wind cable, the controller is connected to the displacement detection device and the tensioning device, and the controller 7 controls the tensioning device to adjust the tension of the wind cable according to the tower displacement data fed back by the displacement detection device 2. The amount of tension applied.
[0037] In this embodiment, the displacement detection device 2 is one of a GPS measuring instrument, a Beidou measuring instrument or an automatic total station. Real-time measurement of tower di...
Embodiment 2
[0043] This embodiment provides a method for using the displacement control system of the cable crane tower for arch bridge construction;
[0044] Such as Figure 1-Figure 3 As shown, the method for using the displacement control system of the arch bridge construction cable crane tower in this embodiment includes the following steps:
[0045] a. Install the displacement detection device 2 on the top of the tower 1;
[0046] b. Install the tensioning device at the anchor end of the wind cable;
[0047] c. Connect the controller 7 with the displacement detection device 2 and the tensioning device;
[0048] d. Apply tension to the wind cable according to the tower displacement detection data.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com