Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0079] like figure 1 A construction method for the middle wall of the upper step of the tunnel that passes through the stratum fracture zone shown, is to carry out the upper step excavation of the constructed tunnel from the back to the front along the longitudinal extension direction of the tunnel to obtain the excavated upper tunnel body 1;
[0080] The tunnel to be constructed is a large-section tunnel and its tunnel hole includes an upper tunnel body 1 and a lower tunnel body located below the upper tunnel body 1, and the upper tunnel body 1 of the tunnel is provided with a temporary support structure of a partition wall; The upper body 1 of the tunnel includes a left guide hole 1-1 and a right guide hole 1-2 located on the right side of the left guide hole 1-1, and the temporary support structure of the partition wall is located in the left guide hole 1-1 1 and the right guide hole 1-2, see for details figure 2 ;
[0081] The initial tunnel support structure of the upp...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com