Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method of constructing center division of upper bench of tunnel crossing stratum fracture zone

A construction method and broken zone technology, which is applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as increased risk of collapse, twisting and deformation of arches, and long construction times

Active Publication Date: 2018-12-11
CHINA RAILWAY 20 BUREAU GRP
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Especially in the construction process of large-section tunnels crossing fault fracture zones, the vault deformation rate is fast after excavation, the subsidence is too large in a short period of time, and the side walls and arches are twisted and deformed. In this case, if conventional construction methods and support systems are adopted, such as step method, three-step method, double-side-wall pilot pit method, CD method, CRD method, etc., the deformation can be controlled very well on the one hand, and on the other hand The construction process is complicated, and the complicated construction method leads to a long construction time and long-term exposure of the surrounding rock, which is likely to cause large-scale encroachment of the surrounding rock, spalling and falling of the shotcrete, and distortion of the steel frame, which further increases the risk of collapse, and the safety and quality cannot be guaranteed. At the same time, it also severely restricts the construction period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method of constructing center division of upper bench of tunnel crossing stratum fracture zone
  • Method of constructing center division of upper bench of tunnel crossing stratum fracture zone
  • Method of constructing center division of upper bench of tunnel crossing stratum fracture zone

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0079] like figure 1 A construction method for the middle wall of the upper step of the tunnel that passes through the stratum fracture zone shown, is to carry out the upper step excavation of the constructed tunnel from the back to the front along the longitudinal extension direction of the tunnel to obtain the excavated upper tunnel body 1;

[0080] The tunnel to be constructed is a large-section tunnel and its tunnel hole includes an upper tunnel body 1 and a lower tunnel body located below the upper tunnel body 1, and the upper tunnel body 1 of the tunnel is provided with a temporary support structure of a partition wall; The upper body 1 of the tunnel includes a left guide hole 1-1 and a right guide hole 1-2 located on the right side of the left guide hole 1-1, and the temporary support structure of the partition wall is located in the left guide hole 1-1 1 and the right guide hole 1-2, see for details figure 2 ;

[0081] The initial tunnel support structure of the upp...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method of constructing a center division of an upper bench of a tunnel crossing a stratum fracture zone. Upper bench excavation is performed on a construction tunnel from rear to front so as to obtain an excavated tunnel upper hole; a center division temporary support structure is arranged in the tunnel upper hole; a tunnel primary support structure of the tunnel upper hole includes an arch wall anchor net spray support structure and an arch wall rigid support system. The upper bench excavation includes I, excavating a left guide hole, and carrying out primary supporting; II, excavating a right guide hole and carrying out primary supporting. The method has simple steps, reasonable design, good construction simplicity and good service effect; a tunnel upper half section is excavated by means of a center division method, excavation section is narrowed, and stability of an arch top is guaranteed; both the arch wall rigid support system and the center division temporary support structure are supported via a lower bearing beam and are connected into an integrated stable-structure support system; settling of a primary support arch frame in the upper hole can beavoided, and stability of primary supporting can be effectively guaranteed.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a method for constructing a partition wall in an upper step of a tunnel passing through a stratum fracture zone. Background technique [0002] With the increase of road traffic and the development of infrastructure projects, large-section tunnels with single-hole, double-lane, and multi-lane highways are becoming more and more common. Compared with single-line small-section tunnel construction, large-section tunnel construction is more likely to cause large-scale subsidence of the vault during the excavation process. Especially in the construction process of large-section tunnels crossing the fault fracture zone, the deformation rate of the vault after excavation is often fast, the amount of subsidence is too large in a short time, the side wall and the arch frame are twisted and deformed, and in severe cases, the tunnel will be damaged. In this case, if ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D11/10E21D11/18
Inventor 郭朋超吴金刚徐国斌徐佳明杨晓芳李俊伟王百忍宋凤报王寅刘海松
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products