The invention discloses a light foamed soil for 
abutment back backfilling. The light foamed soil comprises 
cement, a mixed material, water, a conditioning agent, a 
foaming agent, a micro-foam agent, and a waterproof agent. The invention also provides a preparation method of light foamed soil for 
abutment back backfilling. The micro-foam agent is prepared into foams by a 
plunger pump and an 
air compressor, the materials are mixed and stirred by a stirrer, and the 
slurry extraction speed is controlled by a frequency converter so as to control the volume weight of the finished product. The invention also provides an on-site construction method of light foamed soil applied to 
abutment back backfilling. The light foamed soil provided by the invention belongs to light materials, has small foundation load after filling, greatly reduces the foundation 
treatment intensity, and saves the foundation 
treatment duration. After pouring and before initial setting, light foamed soil has very good fluidity and fill self-compaction, avoids the defect of non-full filling of conventional fillers, has strong 
constructability, and can effectively solve the phenomenon of bumping at bridge head.