Production method for steel die for bearing platform
A manufacturing method and a technology of bearing platform steel, which are applied in the direction of construction and infrastructure engineering, can solve problems such as unsatisfactory construction quality, progress, weak lateral extrusion capacity of retaining soil, and tight construction schedule on site, so as to shorten construction time, The effect of improving the construction progress and making it convenient
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The production sequence of the cap steel mold of the present invention is: blanking according to the design size of the on-site drawings → zero, component processing → assembly, assembly welding → calibration → process inspection → painting → marking → final inspection → storage → on-site installation.
[0031] The manufacturing method of cap steel mold of the present invention comprises the following steps:
[0032] a. The steel formwork of the platform is processed and manufactured according to the size of the platform and the water collection well marked in the construction drawing of the design structure. The steel used should have a material certificate and meet the relevant provisions of the current national standards.
[0033] see now figure 1 , figure 1 It is a structural schematic diagram of the cap steel formwork of the embodiment of the present invention. As shown in the figure, the bearing platform is a steel plate frame surrounded by upright wall plates w...
Embodiment 2
[0041] figure 2 It is a schematic plan view of the installation of the cap steel mold of the embodiment of the present invention, image 3 for figure 2 Sectional view of A-A in Fig. The installation of thin steel plate welded shaped steel bearing platform steel mold of the present invention comprises the following steps:
[0042] (1) The installation of the steel formwork for the platform requires the cooperation of a small excavator. The construction personnel sprinkle the axis and the sidelines of the platform and the water collection well with lime on the soil layer of the foundation pit. The small excavator digs out the position of the steel formwork and mechanically excavates The parts that are not in place need to be cleaned manually.
[0043] (2) After the excavation of the cap steel form is completed, install the cap steel form. During the installation process, the construction technicians use a level to control the elevation, and strictly control the height and t...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 