Preparation method of bucket tooth
A bucket tooth and tooth tip technology, applied in the field of bucket tooth preparation, can solve the problems of reduced impact toughness, easy occurrence of brittle fracture, growth of austenite grains, etc., and achieves reduced heating temperature, good wear resistance, high The effect of impact toughness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
preparation example Construction
[0020] The preparation method of the forged bucket tooth of the present invention comprises the following steps:
[0021] 1) Heating the bar to 900-1000°C, and then hot-extruding to obtain the bucket tooth forging billet;
[0022] 2) reheating the tooth tip of the bucket tooth forging billet obtained in step 1) and making the temperature of the tooth tip the same as that of other parts;
[0023] 3) Quenching the bucket tooth forging blank as a whole after reheating in step 2).
[0024] The bucket tooth of the present invention is a bucket tooth for an excavator.
[0025] The forging billet in step 1) is obtained by a method comprising the following steps: after heating the bar to 900-1000°C, extruding one end of the bar to reach a set taper to obtain a billet, hot extrusion forming the billet, and then writing off Hole and embossing to get the bucket tooth forging billet. The bucket tooth forging billet has tooth tips. The bar material is 30CrMnSi steel or 35CrMo.
[0026...
Embodiment 1
[0036] The preparation method of the forged bucket tooth of the present embodiment comprises the following steps:
[0037] 1) Material selection and cutting. 30CrMnSi round steel with a diameter of 70mm is selected, and the round steel is cut into a 350mm bar by a shearing machine.
[0038] 2) Bar heating. The bars were heated to 900°C using a medium frequency induction tube furnace.
[0039] 3) Forged tip. Using a 160t open fixed table press, extrude one end of the heated bar into an end with a set taper to obtain a billet. The set taper can be set according to the specific design shape of the bucket tooth to be prepared. The forging time is within 5s.
[0040] 4) Die forging. The billet prepared in step 3) is placed in the lower mold cavity of the hot forging die, and the billet is hot-extruded by a 1600t friction press to obtain a bucket tooth billet. Because the forging time is very short (within 5s), the hot extrusion temperature is about 900°C.
[0041] 5) Punchi...
Embodiment 2
[0048] The preparation method of the forged bucket tooth of the present embodiment comprises the following steps:
[0049] 1) Material selection and cutting. 35CrMo round steel with a diameter of 80mm is selected, and the round steel is cut into a 400mm bar by a shearing machine.
[0050] 2) Bar heating. The bars were heated to 950 °C using a medium frequency induction tube furnace.
[0051] 3) Forged tip. Using a 160t open fixed table press, extrude one end of the heated bar into an end with a set taper to obtain a billet. The set taper can be set according to the specific design shape of the bucket tooth to be prepared. The forging time is within 5s.
[0052] 4) Die forging. The billet prepared in step 3) is placed in the lower mold cavity of the hot forging die, and the billet is hot-extruded by a 1600t friction press to obtain a bucket tooth billet. Because the forging time is very short (within 5s), the hot extrusion temperature is about 950°C.
[0053] 5) Punchin...