Crack initiation method adopting crack prefabricating and orientated hydraulic fracturing
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- TAIYUAN UNIV OF TECH
- Publication Date
- 2019-02-15
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to a stope and roadway surrounding rock control technology, in particular to a method suitable for directional cutting of a hard roof, in particular to a prefabricated crack directional hydraulic fracturing initiation method. Background technique
[0002] In the process of coal mining, if there is a hard and difficult roof in the overlying strata of the coal seam within a certain height, there will be safety problems in the following three aspects: First, it is easy to form a large area of suspended roof behind the working face. The collapse produces a strong impact load, causing a hurricane, and at the same time squeezes out a large amount of gas in the goaf, causing a major mine accident. Second, for gob-side retention and gob-side excavation without coal pillars, it is easy to form a suspended roof in the side gob of the side goaf, which leads to an increase in the load of the sideways support, large deformation of the roadwa...