Construction method and system for drainage and salt leaching of soil in saline-alkali soil
A construction method and technology for saline-alkali land, which are applied to the field of construction methods and systems for soil drainage and washing in saline-alkali land, can solve the problems of high planting and maintenance greening costs, increased difficulty in greening planting, low survival rate of seedling planting, etc., and achieve long-term cleaning. The effect of salt and anti-salt suppression, suppression of salt rise, and reduction of soaking time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] A kind of construction method for greening and planting drainage and washing salt on the road green belt of saline-alkali land, see Figure 1-2 , including the following steps:
[0042] Step 1: At 2 saline-alkali soils that need greening, dig a plurality of longitudinal grooves 11 with a depth of 1-1.5 meters, a width of 30-50 cm, and a distance of 5-6 meters along the parallel direction (longitudinal) of the road 9, 11, 60-100 meters It is an interval of 10, the two sides are inclined to the middle, and the slope is 0.35-0.5%.
[0043] Step 2: the direction of the vertical road 9 (horizontally) every 10 meters, from the outermost longitudinal groove of the road to the municipal pipe network well, dig a depth of 1-1.5 meters and a slope of 0.35-0.5%. The groove 13 leads to the municipal road drainage pipe 8 .
[0044] see image 3 , the longitudinal groove is divided into several intervals 10, and the two sides of the adjacent intervals are inclined to the middle, wh...
Embodiment 2
[0050] According to the above method, correspondingly, a system for draining and washing salt in saline-alkali soil, including:
[0051] A number of longitudinal grooves arranged along the parallel direction of the road, the longitudinal grooves are provided with intervals every 60-100 meters, and the two sides of the adjacent intervals are inclined to the middle, with a slope of 0.35-0.5%;
[0052] Several transverse grooves arranged along the vertical direction of the road, the transverse grooves start from the outermost longitudinal grooves to the municipal road drainage pipes, and the transverse grooves pass through the adjacent sections that are inclined towards the middle. , the slope of the transverse groove towards the municipal road drainage pipe is 0.35-0.5%;
[0053] A gravel blind ditch formed by a gravel layer is evenly buried at the bottom of the longitudinal groove and the transverse groove, a yellow sand layer is arranged on the gravel blind ditch, and a non-wo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com