Preparation method and use method of slag condensing agent for molten iron pretreatment
A technology of hot metal pretreatment and slag coagulation agent, which is applied in the field of iron and steel metallurgy, can solve the problems of incomplete slag removal, unclean slag removal, and increased burden, so as to avoid converter sulfur return, reduce production cost, and reduce sulfur return rate. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
preparation example Construction
[0024] A method for preparing a coagulant agent for molten iron pretreatment, comprising the steps of:
[0025] Step 1: Dry aluminum ash and Bayer process red mud at 150°C for 24 hours respectively, and set aside;
[0026] In step 2, the aluminum ash and Bayer red mud after the drying treatment in step 1 are respectively taken for subsequent use. The amounts of aluminum ash and Bayer red mud are respectively 50-55% of aluminum ash and 45-50% of Bayer red mud according to weight percentage. mud;
[0027] Step 3, put the raw materials taken in Step 2 into a three-dimensional mixer and mix for 12 hours, mix evenly, and set aside;
[0028] Step 4, pulverize the mixed material and transfer it to an environment with a temperature of 1400-1600°C for melting, then cool to room temperature and crush it, and get the slag coagulant for pretreatment of molten iron after being taken out of the furnace.
[0029] The main components of the aluminum ash are: Al 2 o 3 65~70%, AlN 18~22%, ...
Embodiment
[0032] Embodiment: When using the slag forming agent prepared by the present invention for the pretreatment desulfurization of molten iron, in the process of spraying 0.5 kg granular magnesium per ton of molten iron for desulfurization, add 0.2 kg of slag forming agent per ton of molten iron; , continue to add the slag coagulant in 4 batches, so that the slag coagulant is scattered on the surface of the molten iron, the amount of each batch is 35 kg, and the total amount of the slag coagulant added is controlled at 1.2 kg per ton of molten iron.
[0033] After adding slag coagulant, SiO2-A1 can be quickly formed on the surface of molten iron 2 o 3 -Fe 2 o 3 Slag system, the slag system has the function of adjusting the basicity and fluidity of slag, and is helpful for the adsorption of inclusions inside the molten steel. In addition, the slag system can also absorb magnesium sulfide and dissolve into the slag, and increase the cohesion of the slag, promote the separation of...
PUM